My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-04-19_PERMIT FILE - C1981010A (31)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981010
>
2023-04-19_PERMIT FILE - C1981010A (31)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2023 8:23:44 AM
Creation date
6/13/2023 8:59:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010A
IBM Index Class Name
Permit File
Doc Date
4/19/2023
Doc Name
Scraper - Topsoil Replacement Talpac Haul Simulations
Section_Exhibit Name
Appendix A
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scraper Topsoil Placement <br /> TOPSOIL.PLACEMENT SCRAPERS Talpac <br /> Haulage System:Scrapers Worst Case 2013 <br /> Haul Cycle:(PRJ�J SP5-94 <br /> _ . material., PRJ T T Ros�erJPRJ 5 day Week..g Nour Shifts <br /> Availability % r 85.00 <br /> Bucket Fill Factor 0.80 <br /> Average Bucket Load Volume cu.yards <br /> 27.14 <br /> Average Payload bcy 18.85 <br /> Operating Hours per Year OpHr/Year 1,099.00 <br /> Average Operating Shifts per Year shifts/Year ?5 bP•hrs factored by avallalityy <br /> min 1.70 Shifts factored by avallabiHty <br /> Average Bucket Cycle Time . <br /> Loaded Transport Time min <br /> Unloaded Transport Time min 0.740.23 <br /> Total Loading unit Cycle Time min <br /> Transport Distance(One Way) feet 1.17 <br /> 00 <br /> Production per Operating Hour bcy 234 6 .23. <br /> P <br /> Production per Loader Operating Shift <br /> bcy 1,640 Max prod.based on 100°k avail. <br /> Production per Year b 257419 <br /> A reduction factored b avail. <br /> Production per Year bcy/Year 267,419 <br /> Discounted Capital Cost $/lacy 0.00 Loading Methodology <br /> Discounted Operating Cost <br /> Discounted Average Cost �bcy 0.00 Single Sided <br /> $Ibcy 0.00 Full Truck <br /> Excavation Target bcy 6,318.00� T Time to move Excavation Target Days <br /> Loader Hrs to move Target Op. Hours. 8 96 Average for 150 Shins <br /> Total Truck Hrs to move Target Op. Hours, 27 <br /> Total cost to move Target 27 <br /> $ 0 <br /> Productivity estimates allow for Insufficient time at the and of the shift to complete another cycle. <br /> Time for the first bucket pass coincides with the truck queuing and maneuvering times. <br /> This simulation Is based on data provided by the equipment manufacturer. <br /> Equipment data should be checked to erasure It is valid for this site. <br /> Prepared by: -Tim Cummins <br /> Prepared for: .PR7 Worst Case Bond Calculations •Trapper Mining Inc. <br /> 5-Apr-20131:06 PM Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.