My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-04-19_PERMIT FILE - C1981010A (31)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981010
>
2023-04-19_PERMIT FILE - C1981010A (31)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2023 8:23:44 AM
Creation date
6/13/2023 8:59:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010A
IBM Index Class Name
Permit File
Doc Date
4/19/2023
Doc Name
Scraper - Topsoil Replacement Talpac Haul Simulations
Section_Exhibit Name
Appendix A
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scraper Topsoil Placement <br /> TOPSOIL PLACEMENT-SCRAPERS Taipac <br /> Haulage System:Scrapers Worst Case 2013 • <br /> MaterlaL• PRJ T al Haul Cycle:fPRJJ H04 <br /> Roster: PRJ 5 day Week_8 Hour Shifts <br /> Avallablilty Rio <br /> Bucket Fill Factor 85.00 <br /> Average Bucket Load Volume . <br /> 80 <br /> cu.yards 27.14 <br /> Average Payload bey 18.85 <br /> Operating Hours per Year OpHr/Year 1,099.00 <br /> Average Operating Shifts per Year shlfts/Year gyp'hrs tctored y'availability <br /> bltyy <br /> Average Bucket Cycle Time 151.70 Shiite factored hY availability <br /> min 1.70 <br /> Loaded Transport Time min <br /> Unloaded Transport Time 0.10 <br /> Total Loading unit Cycle Time min 0. 6 <br /> Transport Distance(One Way) min <br /> Production per Operating Hour feet 26565 <br /> bcy 261..15 <br /> Production per Loader Operating Shift <br /> Production Year bcy 1,828 max prod.based an 900%avail. <br /> bcy <br /> 287 007 A RTgucfE2n factored bj"l,Production per Year bcy/YearDiscounted Capital Cost 287,007 <br /> Discounted Operating Cost $Ibcy 0.00 Loading Methodolo <br /> Discounted Average Cost $lbcy 0.00 Single Sided <br /> $Ibcy Excavation Target 0.00 Full Truck <br /> b <br /> Time to move Excavation Target Days 6,244.00 Average for 150 Shifts <br /> Loader Hrs to move Target Op. Hours. 7.95 <br /> Total Truck Hrs to move Target O 24 <br /> , <br /> Total cost to move Target p Hours. 24 <br /> $ 0 a <br /> Productivity estimates allow for insufficient time at the end of the shift to complete another cycle, <br /> Time for the first bucket pass coincides with the truck queuing and maneuvering times. <br /> This simulation is based on data provided by the equipment manufacturer. <br /> Equipment data should be checked to ensure it Is valid for this site. <br /> Prepared by: Tim Cummins <br /> Prepared for: •PR7 Worst Case Bond Calculations •Trapper Mining Inc. <br /> &Apr-201312:50 PM Page 1 ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.