My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-04-19_PERMIT FILE - C1981010A (31)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981010
>
2023-04-19_PERMIT FILE - C1981010A (31)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2023 8:23:44 AM
Creation date
6/13/2023 8:59:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010A
IBM Index Class Name
Permit File
Doc Date
4/19/2023
Doc Name
Scraper - Topsoil Replacement Talpac Haul Simulations
Section_Exhibit Name
Appendix A
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scraper Topsoil Placement <br /> TOPSOIL,PLACEMENT SCRAPERS Talpac <br /> =Hhulagestem: Scrapers Worst Case 2013 Haut Cycle:(PRJJ MP2 <br /> Matorlat: PRJ T oll Roster: PRJ 5 daY Week-8 Hour Shifts <br /> Availability % • $5.00 <br /> Bucket Fill Factor .80 <br /> Average Bucket Load Volume cu.yards 27.14 <br /> Average Payload bey 18.85 <br /> Operating Hours per Year OPHr/Year 11099.00 Op.hrs factored by availabllity <br /> Average Operating Shifts per Year shiftslYear 157.00 <br /> Average Bucket Cycle Time Shifts factored by avallabufty <br /> min 1.70 <br /> Loaded Transport Time min 0.13 <br /> Unloaded Transport Time min 0.52 <br /> Total Loading unit Cycle Time min 0.85 <br /> Transport Distance(One Way) feet 370.00 <br /> Production per Operating Hour bey 253.08 <br /> Production per Loader Operating Shift bcy 11772 Max prod.based an 100%avail. <br /> Production per Year <br /> - - - -- - _bGY 278,131 Avu..DmdijMnn factored b avail. <br /> Production per Year bcy/Year 278,131 <br /> Discounted Capital Cost $/bcy 0.00 Loading Methodology <br /> Discounted Operating Cost $/bcy 0.00 <br /> Discounted Average Cost $/b Single Sided <br /> $/bcy 0.00 Full Truck <br /> Excavation Target bcy 12,500,00 Average for 150 Shifts <br /> r Time to move Excavation Target Days 16.42 <br /> Loader Hrs to move Target Op. Hours. 49 <br /> Total Truck Hrs to move Target Op. Hours. 49 <br /> Total cost to move Target $ 0 <br /> Productivity estimates allow for insufficient time at the end of the shift to complete another cycle. <br /> Time for the first bucket pass coincides with the truck queuing and maneuvering times. <br /> This simulation is based on data provided by the equipment manufacturer. <br /> Equipment data should be checked to ensure it is valid for this site. <br /> Prepared by: -Tim Cummins <br /> Prepared for: .PR7_Worst Case Bond Calculations •Trepper Mining Inc. <br /> Prepared PM Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.