My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-04-19_PERMIT FILE - C1981010A (31)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981010
>
2023-04-19_PERMIT FILE - C1981010A (31)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2023 8:23:44 AM
Creation date
6/13/2023 8:59:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010A
IBM Index Class Name
Permit File
Doc Date
4/19/2023
Doc Name
Scraper - Topsoil Replacement Talpac Haul Simulations
Section_Exhibit Name
Appendix A
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scraper Topsoil Placement Talpac <br /> TOPSOIL. PLACEMENT-SCRAPERS <br /> Haulage System'Scrapers Worst Case 2013 Haut Cycle.[PRJ]MP1 <br /> —material. Roster: PR.1 5 dag Week-8 Hour Shifts <br /> Availability % 85.00 <br /> Bucket Fill Factor 0.80 <br /> Average Bucket Load Volume cu.yards 27.14 <br /> Average Payload bcy 18.86 <br /> Operating Hours per Year OpHrNear 1,099.00 Op.hrs factored by availability <br /> Average Operating Shifts per Year shifts/Year 157.00 Shifts factored by availability <br /> Average Bucket Cycle Time min 1.70 <br /> Loaded Transport Time min 0.38 <br /> Unloaded Transport Time min 0.33 <br /> Total Loading unit Cycle Time min 0.91 <br /> Transport Distance(One Way) feet 270.00 <br /> Production per Operating Hour bcy 230.61 <br /> Production per Loader Operating Shift bcy 1,677 Max,prod.based on 100%mil. <br /> Production per Year bcy 263,337 A roduMon.factored avail. <br /> Production per Year bcyNear 263,337 <br /> Discounted Capital Cost $Ibcy 0.00 Loading Methodology <br /> Discounted Operating Cost $Ibcy 0.00 Single Sided <br /> Discounted Average Cost $Ibcy 0.00 Full Truck <br /> Excavation Target bcy 4,200.00 Average for 150 Shifts <br /> Y Time to move Excavation Target Days 5.83 <br /> Loader Hrs to move Target Op. Hours. 18 <br /> Total Truck Mrs to move Target Op. Hours. 18 <br /> Total cost to move Target $ 0 <br /> Productivity estimates allow for Insufficient time at the end of the shift to complete another cycle. <br /> Time for the first bucket pass coincides with the truck queuing and maneuvering times. <br /> This simulation is based on data provided by the equipment manufacturer. <br /> Equipment data should be checked to ensure It is valid for this site. <br /> Prepared by: .Tim Cummins .Trapper Mining Inc. <br /> Prepared for: .PR7_Worst Case Bond Calculations 5-Apr-201312:57 PM Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.