Laserfiche WebLink
There will be no topsoil to replace, and no revegetation task to carry out. The sediment control pond will <br /> remain as permanent on the lower site. There is no water and there will be no water treatment to <br /> continue to carry out onsite. The operator will, however, need to use the lower site after reclamation to <br /> support his ongoing water catchment and treatment of the mine effluent on the land immediately east <br /> of the Central Extension area (required under the Consent Decree). <br />