Laserfiche WebLink
Thor Energy — --- -- <br /> Wedding Bell Project <br /> Sec.23 Full Disturbance(100%) Partial Disturbance-Goss-Country Travel(3(P%) <br /> 100%pad <br /> Total Pad Access 100%Total and 30%X-C <br /> 50 ft x 50 Access Rd X-C Access Access Pad and access rd <br /> ft Area Rd Length Width Access Rd Rd Length Rd width Disturbance Access Rd disturbance <br /> PDH ID (ft2) (ft) (ft) ;Area ft2) ft ft ft2 Area ac (ac <br /> PDH 23WBRA A 2500 115 10 1150 115 10 345 0.084 0.065 <br /> PDH 23WBRA B 2500 0 10 0 10 0 0.057 0.05T <br /> PDH 23WBRA C 2500 55 10. 550 55 10 165 0.070 0.061, <br /> PDH 23WBRA D 2500 115 10, 1150 115 10 345 0.084 0.065, <br /> PDH 23WBRA E 2500 655 10. 65 6% 10 1965 0108 0.103 <br /> PDH 23WBRA F 2500 0 10; 0 95 10 285 0.057 0.064 <br /> PDH 23WBRA G 2 105 10, 1050 105 10 315 0,081 0.065, <br /> PDH 23WBRA H 2 130 10: 1300 130 10 390 0.087 0.066 <br /> PDH 23WBRA I 250C 100 10; 1000 100 10 300 0.060 0.064'. <br /> PDH 23WBRA J 250C 0 10' 0 0 10 0 0.057 0.057' <br /> PDH 23WBRA K 250C 55 10: 550 55 10 165 0.070 0.061, <br /> Totals) 27 1330 133CCJ 1425 4275 0. 270 9 <br /> Table 1: Sec.23 Surface disturbance changes from 100%all impacts to 30%overland travel impacts. <br /> (Note—95 feet have been added for the access road to Site F,which was left out of the original estimate) <br />