Laserfiche WebLink
COST SUMMARY WORK <br /> Task description: Cost Summary <br /> Site: Brownstone Quarry Permit Action: 2023 Insp Permit/Job#: M1997065 <br /> PROJECT IDENTIFICATION <br /> Task#: 000 State: Colorado Abbreviation: None <br /> Date: 5/12/2023 County: Larimer Filename: 000 <br /> User: JPL <br /> Agency or organization name: DRMS <br /> TASK LIST (DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> 001 Structural Demolition DEMOLISH 1 40.00 $9,309 <br /> 002 Haul Upper Overburden Pile to Upper Pit TRUCKl 2 154.10 $128,914 <br /> 003 Replace Overburden from Lower Stockpile DOZER 2 47.77 $20,267 <br /> 004 Replacing topsoil over disturbed area(s) DOZER 1 7.36 $1,562 <br /> 005 Rip Storage/Building Storage/Building Area RIPPER 2 4.95 $2,235 <br /> 006 Rip Stockpile Areas/Haul Road RIPPER 2 3.30 $1,490 <br /> 007 Reve etate Affected Areas REVEGE 1 40.00 $50,913 <br /> 008 Mobilization/Demobilization MOBILIZE 1 9.77 $7,606 <br /> SUBTOTALS: 307.25 $222,296 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 2.02 Total= $4,490 <br /> Performance bond: 1.05 Total= $2,334 <br /> Job superintendent: 153.62 Total= $11,541 <br /> Profit: 10.00 Total= $22,230 <br /> TOTAL O&P= $40,596 <br /> CONTRACT AMOUNT(direct+O&P)= $262,892 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT: <br /> Financial warranty processing(legal/related costs): $500 Total= $500 <br /> Engineering work and/or contract/bid preparation: 6.59 Total= $17,325 <br /> Reclamation management and/or administration: 5.00 $13,145 <br /> CONTINGENCY: 0.00 Total= $0 <br /> TOTAL INDIRECT COST= $71,565 <br /> TOTAL BOND AMOUNT(direct+indirect)= $293,861 <br />