Laserfiche WebLink
Page 1 of 2 <br /> EQUIPMENT MOBILIZATION/DEMOBILIZATION <br /> Task description: Mobilization/Demobilization <br /> Site: Brownstone Quarry Permit Action: 2023 Insp Permit/Job#: M1997065 <br /> PROJECT IDENTIFICATION <br /> Task#: 008 State: Colorado Abbreviation: None <br /> Date: 5/12/2023 County: Larimer Filename: 008 <br /> User: JPL <br /> Agency or organization name: DRMS <br /> EQUIPMENT TRANSPORT RIG COST <br /> Shift basis: 1 per day <br /> Cost Data Source: CRG Data <br /> Truck Tractor Description: GENERIC ON-HIGHWAY TRUCK TRACTOR,6X4,DIESEL POWERED, <br /> 400 HP(2ND HALF,2006) <br /> Truck Trailer Description: GENERIC FOLDING GOOSENECK,DROP DECK EQUIPMENT <br /> TRAILER(25T, 50T,AND 100T) <br /> Cost Breakdown: <br /> Available Rig Capacities 0-25 Tons 26-50 Tons 51+Tons <br /> Ownership Cost/Hour: $15.25 $23.06 $37.58 <br /> Operating Cost/Hour: $25.26 $30.83 $51.41 <br /> Operator Cost/Hour: $27.71 $27.71 $27.71 <br /> Helper Cost/Hour: $0.00 $20.22 $20.22 <br /> Total Unit Cost/Hour: $68.22 $101.82 $136.92 <br /> NON ROADABLE EQUIPMENT: <br /> Machine Weight/ Owner ship Haul Rig Fleet Haul Trip Return Trip DOT Permit <br /> Description Unit Cost/hr/unit Cost/hr/uni Size Cost/hr/ Cost/hr/fleet Cost/fleet <br /> (TONS) t fleet <br /> Cat D7R DS XR 32.01 $92.78 $101.82 2 $389.20 $203.64 $250.00 <br /> Series II <br /> CAT 938H 16.34 $40.85 $68.22 2 $218.14 $136.44 $500.00 <br /> Subtotals: I $607.34 $340.08 $750.00 <br /> ROADABLE EQUIPMENT: <br /> Machine Description Total Cost/hr/ Fleet Size Haul Trip Return Trip <br /> unit Cost/hr/fleet Cost/hr/fleet <br /> Water Tanker,2,500 Gal. $30.60 1 $30.60 $30.60 <br /> Generic 12-18 cy,6x4 $106.31 4 $425.24 $425.24 <br /> Subtotals: $455.84 $455.84 <br /> CIRCES Cost Estimating Software <br />