My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-05-30_REVISION - M1997065
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1997065
>
2023-05-30_REVISION - M1997065
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2023 9:49:09 AM
Creation date
5/31/2023 11:07:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997065
IBM Index Class Name
Revision
Doc Date
5/30/2023
Doc Name Note
Notice surety Increase
Doc Name
Notice of Surety Increase
From
DRMS
To
Justyn Hamilton - LJS, LLC
Type & Sequence
SI1
Email Name
JLE
SMS
JPL
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tmck/Loader Worksheet Cont'd Task#002 Page 4 of 4 <br /> Haul Route: <br /> Seg# Haul Distance Grade(%) Roll.Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> (min) <br /> 1 400.00 -10.00 2.00 -8.00 1749 0.318 <br /> 2 500.00 5.00 2.00 7.00 1568 0.324 <br /> Haul Time: 0.642 minutes <br /> Return Route: <br /> Seg# Haul Distance Grade(%) Roll.Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> min <br /> 1 500.00 -5.00 2.00 -3.00 2938 0.228 <br /> 2 400.00 10.00 2.00 12.00 1440 0.337 <br /> Return Time: 0.565 minutes <br /> Total Truck Cycle Time: 4.837 minutes <br /> Loading Tool unit <br /> Production 375.00 LCY/Hour Adjusted for job efficiency: 311.25 LCY/Hour <br /> Truck Unit Production <br /> 211.65 LCY/Hour Adjusted for job efficiency: 175.67 LCY/Hour <br /> Optimal No. of Trucks: 2 Truck(s) Selected Number of Trucks: 2 Truck(s) <br /> Adjusted hourly truck team production: 351.34 LCY/Hour <br /> Adjusted single truck/loader team production: 311.25 LCY/Hour <br /> Adjusted multiple truck/loader team production: 622.50 LCY/Hour <br /> JOB TIME AND COST <br /> Fleet size: 2 Team(s) Total job time: 154.10 Hours <br /> Unit cost: $1.344 /LCY Total job cost: $128,914 <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.