Laserfiche WebLink
5. Describe proposed surface excavation or other land disturbance, including roads, pits, <br /> trenches,waste piles, drill pads and collar areas of underground workings,ponds,etc. <br /> 3 objectives:.Establish water monitoring wells around the existing mill tail pad.2.Removal of up to 100 tons of existing mill tails for <br /> the purpose of process testing 3 Exploration drilling of"level 14"at the surface and within the"level 14"tunnel.All access will be <br /> completed with existing roads.All activities will occur within the lower Camp Bird's current operational area. <br /> The 160 to is of noll tell material wb"be removed f-orn the Narth sode el H a tode mill tails.The mate.me'will be take.,F.a...il-e a @at-- <br /> furthest away from the slope of Canyon Creek.Overburden and sand cap will be stripped and set aside.The material will be <br /> excavated in increments.After excavation the area will be refilled with sand material and re-contoured. <br /> All drill locations within current permitted boudary and within the patented lands of the company.Drilling for the purpose of core <br /> samples.Wate, fo, dii'ling will come from level 14 adit.Milling wastewatei Yvill be co"ected into portable closed containeis and <br /> disposed of into the settling pond on site.Drill pads will be standard with the intent of core drilling.Water monitoring wells will be <br /> cased and set for quarterly monitoring <br /> Vegetation minimal to non-existant thus vegetation disburtance would be limited to none. <br /> 6. Proposed Disturbance (approximate) Describe the proposed drilling to be conducted, <br /> including anticipated number of holes,diameter, depth,location, etc. Submit additional <br /> pages if necessary: <br /> A. Drill Pads: <br /> Average Average <br /> Quantity 10 Width (ft) 20 Length (ft) 20 <br /> B. Drill Holes: <br /> Diameter <br /> Quantity 10 Depth (ft) 100 (in) 2 <br /> C. Mud Pits <br /> Average Average Average <br /> Quantity Width (ft) Length (ft) Depth (ft) <br /> D. Described proposed underground work, including reopening of old workings, <br /> advancement of adits or shafts, trenches, pits, cuts, rock dumps, or other types of <br /> disturbance,describe type,quantity and general dimensions: <br /> Underground drilling will occur within the existing level 14 tunnel. Access is from the the level 14 adit. No <br /> doStUFbanees. DFillillg will be in 60'iROFemenis. Tunnel will be dFilling Only, no etheF distwbanGes <br /> Caldera will use water from the Level 14 portal. Water rights are attached in the suppemental pictures. <br /> Water fiews eA 2.1 eYs er appfeximeAely 900@prn. WateF usage when drilling will be 18 @pFn. EFesien eentfel <br /> will be by wattles surrounding the drill rig. Sample pictures on supplemental document. <br /> Form 2—Public File Page 6 of 14 <br />