My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-05-27_REVISION - C1981010 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2023-05-27_REVISION - C1981010 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2023 9:15:22 AM
Creation date
5/27/2023 9:13:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Revision
Doc Date
5/27/2023
Doc Name
Issuance Letter
From
DRMS
To
Trapper Mining, Inc.
Type & Sequence
PR11
Email Name
RAR
JLE
Media Type
D
Archive
No
Supplemental fields
Permit Order
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Trapper Mine”, submitted as a revised map with this permitting action on 5 April 2023, TMI must <br />submit the following: <br /> <br />1. A minor revision that includes the results of a cultural resources inventory conducted on the 25.4 <br />acres located in the L pit and the 4 acres near the J Pit area as shown on permit map M45. These <br />cultural survey results shall be submitted from the cultural resources specialist who conducted the <br />inventory in the form of a full inventory report or a statement of findings. The inventory must be a <br />class III cultural resource inventory completed by a cultural resource specialist who meets the <br />Secretary of Interior’s Standards. The results must indicate if any cultural and historic resources <br />listed or eligible to be listed on the National Register of Historic Places and any significant known <br />archaeological sites were identified during the inventory per Rule 2.04.4. If any are identified, TMI <br />must revise the permit to include the required information to satisfy Rule 2.05.6(4) prior to affecting <br />this area. If no resources are identified, once the minor revision is approved and issued, TMI could <br />proceed to affect this area. <br /> <br />2. If the minor revision discussed above only included a statement of findings describing the results <br />of the inventory, TMI shall submit a separate minor revision that includes the full detailed inventory <br />report prepared by the cultural resource specialist. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.