Laserfiche WebLink
MINING PLAN AND TIMETABLE EXHIBIT D(CONT) <br /> Water Resources . <br /> In general, mining will commence in Phases 1, 2 & 4 on the south <br /> end and work north as shown by the arrows on the MINING PLAN MAP. In Phase <br /> 3, mining will start on the north and work south. The maximum length <br /> and cut/fill volumes of the working face and backfill on the side wings <br /> in each stage are shown on the MINING PLAN MAP. <br /> The mining setbacks will vary from the permit boundary and <br /> structures as allowed by each agreement for said structures and/or <br /> the Geotechnical Stability Analysis . This analysis shows that using <br /> the 25 feet setback from the slurry wall is adequate to meet the factors <br /> of safety in the DRMS Rules and Regulations, (see D&A Slope Stability <br /> Factor of Safety Results Summary Table on Page 4 of their report) . <br /> The proposed setbacks are shown in the Setback Table on EXHIBIT <br /> C - STRUCTURES M� MAP <br /> The material will be mined using loaders and excavators (track <br /> hoes) to remove material from the face . The material will then be <br /> delivered to the Plant for processing using haul trucks or a conveyor <br /> system. No blasting will take place at this mine. <br /> Reclamation will run concurrent with mining to control the amount <br /> of disturbed area in the mine at any-one-time . Reclamation begins in <br /> an area once the section is fully mined, and large enough for efficient <br /> reclamation (backfilling, compacting, sloping, soiling, etc. ) that <br /> will not have to be re-disturbed. <br /> This pit will be operated year-around by L.G. Everist, Inc. , <br /> weather permitting. There may be periods when the demands for <br /> material are slow and no mining will take place, creating an in- <br /> termittent operation situation . <br /> Areas not included in the bonded area will remain in agricultural <br /> production. <br /> a-re m intenanee is i�etaj-ne,l ley t1,e , ,nd, .. <br /> Please refer to the MINING TIMETABLE for the estimated acreage of each <br /> area associated with the mining part of this operation. <br /> Mining equipment may include but is not limited to, front-end <br /> loaders, scrapers, excavators, a drag line, dozers, off-road haul <br /> trucks, dump trucks and a water truck. <br /> Most of the water used on site will be for dust control used on <br /> haul roads or with sand and gravel processing. Please refer to EXHIBIT <br /> G - WATER for the discussion of how water will be used at the site, the <br /> estimated yearly needs, and the source (s) of said water. Prior to <br /> mining into the groundwater table, the applicant/operator/permittee <br /> will obtain a Substitute Water Supply Plan approval from the Division <br /> of Water Resources . <br /> L.G. EVERIST, INC-WEST FARM RESERVOIRS May 11, 2023 <br /> 13 <br />