My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-05-25_PERMIT FILE - M2022048 (18)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2022048
>
2023-05-25_PERMIT FILE - M2022048 (18)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/25/2023 9:04:40 PM
Creation date
5/25/2023 2:42:55 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2022048
IBM Index Class Name
Permit File
Doc Date
5/25/2023
Doc Name Note
Review Assistance Document
Doc Name
Adequacy Review Response
From
Environment Inc/LG Everist Inc
To
DRMS
Email Name
ECS
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� r <br /> MINING PLAN AND TIMETABLE EXHIBIT D(CONT) <br /> permit/affected lands line is established one-hundred (100) feet west <br /> and parallel to the top side of the west bank along the South Platte <br /> River. Over the years, it appears this bank has been lined in places <br /> with armoring materials by previous landowners . Ne ffiininef will } ,ke <br /> ialaee within a fftiniffium ef 2�9 feet fi�efft the river bank thate-x� <br /> this fly <br /> The initial access to the site is via an existing Private Road <br /> located on the east side of CR 21 and approximately 1 . 37 miles north <br /> of Highway 66. In most cases, existing farm roads within the permit <br /> area will be used for mining needs and existing farm entrances on the <br /> paved roads will be used to cross the public ROW' s . The initial Plant <br /> Site will be located on approximately 50 . 00 acres of Phase 4, located <br /> on the southeast corner of CR 21 and CR 32 . 5 . This Plant Site will <br /> be used throughout the life of the mine, as material will be conveyed <br /> or hauled to the plant from each Phase . <br /> In the future, 2 conveyor crossings may be installed from the <br /> northern area to the southern area. These crossings will be <br /> self-contained clear span units over CR 32 . 5 with all support <br /> structures to be built outside the road ROW' s, but within the affected <br /> lands . They are part of the approved Platteville Development Plan <br /> and this would only happen after LGE has filed and received approval <br /> for a Technical Revision with the Division that would include showing <br /> the proposed location and design details for the crossings . The <br /> approximate proposed locations are shown on EXHIBIT C-1 MINING PLAN MAP. <br /> The phase access roads will be constructed of gravel obtained <br /> from on site . They will be at least 20 feet wide and graded to allow <br /> for drainage into the site and have ditches as necessary to collect <br /> runoff. Any runoff from the roads will be retained on-site and <br /> allowed to soak into the ground or evaporate . The roads will be <br /> maintained as needed. Access roads will be built around each water <br /> storage reservoir to provide access during mining, reclamation, and <br /> after release. The access roads will remain when reclamation ends <br /> as they will be used to access the property. <br /> GEOLOGIC SETTING <br /> The affected lands are located along the South Platte River in <br /> a Quaternary age, Piney Creek alluvial deposit . The eastward dipping <br /> beds of upper Cretaceous age Laramie formation are overlain at an <br /> angular unconformity, by the Piney Creek alluvium. The sand and gravel <br /> encountered in the Piney Creek alluvium are a result of water erosion <br /> L.G. EVERIST, INC-WEST FARM RESERVOIRS April 24, 2023 <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.