My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-05-25_PERMIT FILE - M2022048 (7)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2022048
>
2023-05-25_PERMIT FILE - M2022048 (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/25/2023 9:10:30 PM
Creation date
5/25/2023 2:16:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2022048
IBM Index Class Name
Permit File
Doc Date
5/25/2023
Doc Name Note
Exhibit G - Water Information - Groundwater Quality Monitoring Plan
Doc Name
Adequacy Review Response
From
Environment Inc/LG Everist Inc
To
DRMS
Email Name
ECS
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Groundwater Quality Monitoring Plan <br /> It is proposed that "control charts" be constructed for each of the indicator parameters in <br /> each of the water systems so that annual water quality data can be tracked to evaluate <br /> any potential trends in water quality. For all of the parameters there will be an upper <br /> control limit beyond which a significant change in ambient water quality can be <br /> assumed. It is also proposed that the stream standard for each of the indicator <br /> parameters be shown on the control chart, as, for some parameters, stream standards <br /> may have already been exceeded in the background water quality, while, for other <br /> parameters, stream standards are above the expected range of natural variations in <br /> water chemistry. <br /> These control charts would be prepared on an annual basis as additional water quality <br /> data become available from additional sampling events. <br /> 4.0 REPORTING <br /> It is proposed that control charts, generated on a quarterly basis, will be provided to the <br /> Division on an annual basis to demonstrate changes in water quality with time. If <br /> exceedances of the control charts are noted after regular annual sampling, a specific <br /> response plan will be prepared by LGE to address that issue. The specific response <br /> plan would be based on an evaluation of the number of indicator parameters that show <br /> exceedances and the duration of these exceedances. <br /> 5.0 VERIFICATION RE-SAMPLING <br /> Under certain circumstances a verification re-sampling may be collected, and samples <br /> submitted for analysis using the Groundwater Sampling Plan. The samples will be <br /> collected within four weeks of the analytical report date. A verification sample may be at <br /> collected the following sampling event depending on the frequency of sampling. <br /> Verification re-samples are designed to provide confirmation of the sample analytical <br /> data for sample result anomalies or statistical analysis. <br /> ,g-,MOLEN LG Everist Monitoring Plan <br /> &ASSOCIATES Page 7 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.