Laserfiche WebLink
ENVIRONMENT, INC. PAGE 7 <br /> L.G. EVERIST, INC.-WEST FARM RESERVOIR ADEQUACY RESPONSE 01 <br /> MAY 23, 2023 <br /> Page 23 has been revised by removing this text. A copy of the revised Exhibit E - <br /> Reclamation Plan is enclosed. <br /> 19) Note #6 on the provided bank armoring plan states that the armoring will be <br /> covered with a 6"layer of growth medium and seeded, however the reclamation <br /> plan and text on P114 calls for 1 T-12"of topsoil to be replaced prior to seeding. <br /> Please revise Note #6 for consistency as needed. <br /> Thanks for pointing this out. Note #6 has been revised to match the 10-12 inches of <br /> topsoil cover. A copy of the Bank Armoring Plan with a revised Figure 1 is enclosed. <br /> 20) DRMS notes that the Minimum allowable Factor of Safety (FOS) for the <br /> proposed bank armoring is 1.25 and the calculated FOS for the armoring plan <br /> provided is 1.26. You may wish to consider revising the bank armoring plan to <br /> allow for more than a 0.01 margin of error in Factor of Safety. <br /> It seems a little odd to me to provide a FOS for the FOS. The FOS formula requires an <br /> average minimum size be used for b50. The size of material committed to in the Bank <br /> Armoring plan was 9 to 15 inches with fines mixed in. Twelve (12) inches was chosen, as it <br /> is the average size proposed, for use in the formula so the minimum FOS could be <br /> calculated. If the average overall riprap size is increased to 13.5 inch average, the <br /> F05=1.30. <br /> EXHIBIT F - Reclamation Plan Map (Rule 6.4.6): <br /> 21) The reclamation plan map will need to be modified as necessary for consistency <br /> and accuracy when addressing adequacy revisions. <br /> A copy of the revised Exhibit F - Reclamation Plan Map is enclosed. <br /> EXHIBIT G -Water Information (Rule 6.4.7): <br /> 22) The applicant will need to provide a site characterization and groundwater <br /> monitoring plan, including at least five quarters of baseline/background water <br /> level and groundwater analytical data, sufficient to demonstrate compliance with <br /> the requirements of the "Water Quality Control Commission Regulation No. 41 - <br /> The Basic Standards for Groundwater"for the life of the proposed operation. <br /> Please note that permanent monitoring wells and Point of Compliance (POC) <br /> wells should be placed where they will not be mined through. <br />