ENVIRONMENT, INC. PAGE 2 <br /> L.G. EVERIST, INC.-WEST FARM RESERVOIR ADEQUACY RESPONSE 01 <br /> MAY 23, 2023 <br /> found that the notes on the C map did not match what was on the map so it was moved to <br /> the Exhibit C-1 Mining Plan Map. <br /> 2) Information for structures within the permit and within 200'of the permit as listed <br /> on Exhibit C-1 Mining Plan Map should be identified on the provided Exhibit C-2 <br /> Structures Map. All structures listed should be identified on this map so that they <br /> may be correlated to the correct structure owner. <br /> The structure information list on Map Exhibit C-1 -Mining Plan Map was moved to Map <br /> Exhibit C-2. This structures list has key letters added to each owner that corresponds to <br /> the location of the structure and their owners marked on the map. <br /> 3) The surface drainage corridor which conveys irrigation return flows from the <br /> adjacent property to the south, back to the South Platte River, as observed <br /> during the pre-operational inspection, has not been shown on the existing <br /> conditions map - Please revise as needed. <br /> I have hatched and labeled the return flow drainages so they are easily identified on the <br /> Map Exhibit C. <br /> 4) No description of existing vegetation has been provided as required by (e). <br /> I added the vegetation information Exhibit J to Map Exhibit C. <br /> 5) Please show the location of the 50 acre Plant Site as described on the Mining <br /> Plan Map, including the location of the gravel washing/processing area, concrete <br /> batch plant, asphalt plant and recycling facility. Sufficient detail will need to be <br /> provided for these facilities so that an accurate bond for removal and reclamation <br /> can be calculated. <br /> The 50 acre Plant Site envelope is show as the \\\ hatched area in Phase 4 on Map <br /> Exhibit C-1. L.G. Everist does not have a specific Plant Site Layout at this time, and it is <br /> unreasonable to require this as it hinders LGE's flexibility to operate the mine if they <br /> have to file a change of plans every time they make an operations change. to the Plant <br /> Site area that is already designated in Phase 4 on Map Exhibit C-1 is where the various <br /> processing plants and stockpile areas will be located. For bonding purposes, the gravel <br /> processing plant, scales, asphalt and concrete plants will be portable equipment and would <br /> be removed if the mine failed. We have included a cost to remove an estimated 300 <br /> cu-yds of concrete foundations from the Plant Site to cover the temporary foundations <br /> for the listed equipment. When mining is scheduled to begin, this will increase to 500 <br /> cubic yards to cover all foundations, including the conveyor crossing and runs as Shown on <br /> Table L4 in the cost estimate. <br />