Laserfiche WebLink
b) The Board will enter the lands to perform reclamation only if the Board has determined that: <br /> i. Reclamation required by the permit,statute, or regulations to be performed upon such lands <br /> has not been performed, or <br /> ii. Financial warranty forfeiture proceedings described in the Act or similar provisions of <br /> subsequent laws, if any, have been initiated. <br /> c) The Division,acting for the Board, will enter lands to respond to an emergency only where the <br /> Division determines that any of the conditions of Construction Materials Rule 8.4.2 exist. <br /> 7) The additional conditions set forth in the attached rider, if any, are incorporated herein by reference. <br /> a) Rider is attached. <br /> XX b) No rider is attached. <br /> MINED LAND RECLAMATION BOARD <br /> COLORADO DEPARTMENT OF NATURAL RESOURCES <br /> Virginia Brannon <br /> 0?Division Director <br /> [3] <br />