Laserfiche WebLink
Mr. Mark Johnson <br /> January 2 , 2014 <br /> Page 2 <br /> GEOTECHNICAL CONDITIONS <br /> The mine site is located on a terrace of St Vrain Creek. The Piney Creek Alluvium most likely overlies sandstone <br /> and claystone bedrock of the Denver Formation. Exploratory borings drilled by Northern Colorado Geotech (NCG, <br /> 2003) primarily along the southern boundary of the site, encountered three to seven feet of overburden topsoil and <br /> silty clayey sand overlying sand and gravel ranging in depth from 17 feet to the maximum depth drilled of 20 feet. <br /> Weathered siltstone/claystone was encountered in one boring at 17 feet in depth below the existing ground surface. <br /> From a geotechnical standpoint, the sand and gravel will form the majority of the mine slopes. These soils are <br /> generally strong and stable, particularly when dewatered. <br /> SITE GROUNDWATER <br /> Civil Resources conservatively modeled the groundwater at five feet below the ground surface, based on the NCG <br /> geotechnical exploration completed by Terracon in September 1997. <br /> STRUCTURES WITH 200 FEET OF DISTURBED AREAS <br /> The known, permanent, man-made structures within 200 feet of the proposed mine areas that are not owned by <br /> Bestway Concrete &Aggregates are listed below: <br /> • Last Chance Ditch relocation (western, northern, and eastern boundaries) <br /> • WCR 11.25 (western boundary) <br /> • Stinar of Longmont, residence,sheds, barn,dairy milking parlor, metal grain bin, and fences(western <br /> boundary) <br /> • Vogl Trustees of Longmont, residence and utility shed (northwestern boundary) <br /> • Overhead power line (northern boundary) <br /> • WCR 26 (northern boundary) <br /> • Kerr-McGee Burch 3-1A well (northeast corner of site) <br /> • Rural Ditch Return relocation (eastern boundary) <br /> • Rural Ditch Return—Phase 1 (eastern half of site) <br /> • Kerr-McGee oil road (southern boundary) <br /> • Rural Ditch Return relocation (southern boundary) <br /> • Kerr-McGee gas line (southern boundary) <br /> • Lee of Longmont(Globoker Owner), residence, sheds, dairy milking parlor,grain bin (southwest boundary) <br /> STABILITY ANALYSES <br /> The stability of the proposed mining limits was evaluated at six sections under anticipated loading conditions <br /> around the perimeter of the site and is discussed below. The computer program XSTABL was used for the <br /> analysis. The method for selecting the critical failure surface for each analyzed loading condition is the following. <br /> The Modified Bishop's Method of Analysis is used to find the critical failure surface by randomly searching with 12 <br /> termination points and 12 initiation points (144 failure circles)with 7 foot line segments over a broad range of the <br /> slope surface. This procedure is repeated over different initiation and termination locations until the most critical <br /> factor of safety failure surface is identified. The range is narrowed and 12 initiation points and 12 termination points <br /> (144 failure circles)with 7 foot line segments for the final run of 144 circles to determine the lowest factor of safety. <br />