Laserfiche WebLink
3. Describe the estimated topsoil depth and how topsoil will be salvaged,stockpiled and <br /> redistributed for the re-establishment of vegetation. Specify approximate topsoil <br /> redistribution depth: <br /> BLM Tres Rios Field Office recommends these data be determined with input given during the site visit with <br /> file number COC-80448)application.) <br /> The 11 drill pads and 1330 feet of new road will be reclaimed by putting back the 1511.1 cubic yards of <br /> A ene feet depth of tepee'!will be Fem d and Fepleeed fGF both Feads and ddl!pads. The sell in this FnateFial that weFe iRitially Fneved to mate them(see 111.6 abeye). <br /> desert environment is not indicative of true topsoils of more moist environments. If the road and pad grades <br /> ape slight enough fGF eafe tFavel,no mateFial will be FeFneved and#affie will rAeve en the suFfaee. DUARg <br /> reclamation,traffic ways will be scarified to break compaction and then seeded and harrowed/raked. <br /> 4. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required <br /> abandonment procedures): <br /> Holes will be backfilled with cuttings to the extent possible, Then a "spider" style hole <br /> pug will be Inserted ive feet down the dFill hole which will en be fillo with a bag o <br /> hentonite to the surface Plugging will occur the completion of each drill hole <br /> (after e-logging). See Rule 5.4.2 (5) of Colorado Hardrock/Metal Mining Rules. As <br /> table.stated in iten, 111. 6. K above, the bottonis of the drill holes will be above water <br /> 5. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be <br /> reclaimed(refer to Rule 3 and Rule 5 for specific reclamation performance standards). <br /> You may wish to contact the Division for closure specifications. <br /> Not applicable. This project is a drilling program only. <br /> Form 2—Public File Page 9 of 14 <br />