My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-05-19_PERMIT FILE - P2023010 (2)
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2023010
>
2023-05-19_PERMIT FILE - P2023010 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2023 8:45:53 PM
Creation date
5/22/2023 10:36:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2023010
IBM Index Class Name
Permit File
Doc Date
5/19/2023
Doc Name
Notice Of Intent
From
Jim Guilinger
To
DRMS
Email Name
LJW
THM
SMS
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S. Describe proposed surface excavation or other land disturbance, including roads, pits, <br /> trenches,waste piles,drill pads and collar areas of underground workings,ponds, etc. <br /> Eleven 450 foot deep vertical reverse circulation drill holes with each drill site requiring a 50x50 foot drill <br /> pa deep). six of the drill Sites will be accessed y a pre-existing 4wd road and, and then by <br /> purpose-build temporary access roads to five of the six sites. Five sites will reuse a temporary access <br /> road made and reclaimed in 2022 to hole 22WBRA011 (2021 NOI Site D-11). From there temporary <br /> roads will be made to four of the five holes Figure 1 shows the locations of the proposed holes and <br /> access roads. All eleven holes are on land of low topographic relief. Because of flat terraine at several <br /> of the s*teq. some drill pads may not he needed Assuminga" Ilareneeded' the amoi lot of drill pad <br /> material moved would be: 11x50x5Oxl ft= 1018.5 cubic yards of material. The new roads cut would <br /> The grand total of material moved is= 1,511.1 cubic yards. <br /> 6. Proposed Disturbance (approximate) Describe the proposed drilling to be conducted, <br /> including anticipated number of holes,diameter,depth,location, etc. Submit additional <br /> pages if necessary: <br /> A. Drill Pads: <br /> Average Average <br /> Quantity 11 Width (ft) 50 Length(ft) 50 <br /> B. Drill Holes: <br /> Diameter <br /> Quantity 11 Depth (ft) 450 Weach (in) approx. 5.5 <br /> C. Mud Pits <br /> Average Average Average <br /> Quantity 0 Width (ft) n/a Length(ft) n/a Depth (ft) n/a <br /> D. Described proposed underground work, including reopening of old workings, <br /> advancement of adits or shafts, trenches, pits, cuts, rock dumps, or other types of <br /> disturbance,describe type,quantity and general dimensions: <br /> None <br /> Form 2-Public File Page 6 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.