Laserfiche WebLink
Journey Ventures Pit <br /> Summary of Operational Losses and Lagged Depletions V%ham a,"'V1.bs[o,uU6au&1 1 C <br /> Table 3 <br /> Submitted by: <br /> Paul Weiss <br /> 5255 Ronald Reagan Boulevard,Ste.220 <br /> Johnstown,C080534 Ph:970-221-5159 <br /> Operational Evaporative Total Lagged Percent of Month Net Augmentation <br /> Month Losses(ac-ft) Losses(ac-ft) Losses(ac-ft) Depletions'(ac-ft) Under Call Conditions Requirementz(ac-ft <br /> Apr-23 0.25 0.41 0.66 1.02 1001/6 1.68 <br /> May-23 1.00 0.62 1.62 1.00 1001/6 2.62 <br /> Jun-23 1.00 0.78 1.78 0.91 1001/6 2.69 <br /> J u I-23 1.00 0.85 1.85 0.89 1001/6 2.74 <br /> Aug-23 1.00 0.78 1.78 0.84 1001/6 2.62 <br /> Sep-23 1.00 0.61 1.61 0.77 1001/6 2.38 <br /> Oct-23 0.75 0.43 1.18 0.75 1001/6 1.93 <br /> Nov-23 0.25 0.24 0.49 0.69 1001/6 1.18 <br /> Dec-23 0.00 0.18 0.18 0.67 1001/6 0.85 <br /> Jan-24 0.00 0.15 0.15 0.64 1001/6 0.79 <br /> Feb-24 0.00 0.08 0.08 0.56 1001/6 0.64 <br /> Mar-24 1 0.00 0.16 0.16 0.57 1001/6 0.73 <br /> Total 6.25 5.29 11.54 9.31 20.85 <br /> CCWCD Transit Losses3 Supplemental Water Balance Dewatering <br /> Month blank Delivery(ac-ft) (ac-ft) Water(ac-ft) (ac-ft) (ac-ft) <br /> Apr-23 1.90 0.06 0.00 0.16 8.00 <br /> May-23 2.80 0.10 0.00 0.09 8.00 <br /> Jun-23 2.90 0.10 0.00 0.11 8.00 <br /> Jul-23 2.95 0.10 0.00 0.11 8.00 <br /> Aug-23 2.80 0.10 0.00 0.09 8.00 <br /> Sep-23 2.70 0.19 0.00 0.13 8.00 <br /> Oct-23 2.10 0.07 0.00 0.09 8.00 <br /> Nov-23 1.35 0.05 0.00 0.12 8.00 <br /> Dec-23 1.00 0.03 0.00 0.12 8.00 <br /> Jan-24 0.95 0.03 0.00 0.13 8.00 <br /> Feb-24 0.80 0.03 0.00 0.13 8.00 <br /> Mar-24 1 1 0.90 0.03 1 0.00 1 0.14 1 8.00 <br /> Total 1 0.00 1 23.15 0.89 0.00 1.41 96.00 <br /> Lagged Depletions calculated with AWAS;w=9500 ft,x=4766 ft,T=100,000 gpd/ft,S=0.20 <br /> 2 Net Augmentation Requirement equal to current monthly losses plus lagged depletions from pre April 2022 operations <br /> 3Transit Losses are calculated as 1/2%per mile.The distrance from CCWCD's Geisert Pit to the Journey Ventures Pit is 6.8 miles. <br /> 7 <br />