Laserfiche WebLink
Rifle Gravel Pit#1 May 2023 <br /> 4.5 Mining Maps <br /> Figure 9, Exhibit C4 depicts the proposed mining operations at the Phase 1, Phase 2, and <br /> Phase 3 30% development stage. Figure 10, Exhibit C5 depicts the proposed mining <br /> operations at the Phase 3 60% development stage. Figure 11, Exhibit C6 depicts the <br /> mining conditions at Phase 3 100% development(i.e., final conditions). Please note that <br /> these are sheets extracted from the drawing set in Attachment A and have callouts and <br /> leaders on the drawing that define specific features. These drawings are part of other permit <br /> applications that require features to be called out differently than DRMS yet serve multiple <br /> purposes across permitting agencies. <br /> 17 <br />