My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-05-17_PERMIT FILE - M2021052
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2021052
>
2023-05-17_PERMIT FILE - M2021052
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2023 8:40:33 PM
Creation date
5/18/2023 8:36:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2021052
IBM Index Class Name
Permit File
Doc Date
5/17/2023
Doc Name
Adequacy Review Response
From
IHC Scott
To
DRMS
Email Name
ACY
THM
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
280
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rifle Gravel Pit#1 May 2023 <br /> TABLE OF CONTENTS <br /> 1.0 General Operation Information 1 <br /> 1.1 Applicant/Operator 1 <br /> 1.2 Operation Name (pit, mine or site name) 1 <br /> 1.3 Permitted Acreage 1 <br /> 1.3.1 New DRMS 112 Permit 1 <br /> 1.3.1.1 Affected Lands 2 <br /> 1.3.1.2 Planned Material Storage Area 2 <br /> 1.3.1.3 Planned Topsoil&Overburden Storage Areas 2 <br /> 1.4 Total Parcel Size 2 <br /> 1.5 Commodity to be Mined 2 <br /> 1.6 Legal Description of the Permitted Area 2 <br /> 2.0 Exhibit A—Legal Description 3 <br /> 2.1 Legal Description - Rifle Pit Parcel 3 <br /> 2.2 Legal Description —Permitted Area 3 <br /> 2.2.1 Main Entrance and Access Road 4 <br /> 2.2.2 Operations Area 4 <br /> 3.0 Exhibit B—Index Map 6 <br /> 4.0 Exhibit C—Pre-Mining and Mining Plan Map(s) of Affected Lands 8 <br /> 4.1 List of Permanent Structures 11 <br /> 4.2 Adjoining Surface Landowners Map Information 11 <br /> 4.3 Topography and Aquifer 11 <br /> 4.4 Vegetation 14 <br /> 4.5 Mining Maps 17 <br /> 5.0 Exhibit D—Mining Plan 21 <br /> 5.1 Project Location and Information 21 <br /> 5.2 Mine Facilities and Operation 21 <br /> 5.2.1 Site Development and Grading(Phase 1 [P11) 22 <br /> 5.2.1.1 Mining Methods and Earthmoving 22 <br /> 5.2.1.2 Planned Topsoil &Overburden Storage Area 23 <br /> 5.2.1.3 Water Diversions and Impoundments 26 <br /> 5.2.1.4 Water Handling, Dewatering, and Permits 26 <br /> 5.2.2 Mining Preparation (Phase 2[P21) 26 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.