Laserfiche WebLink
include a task item for the remaining 6.5 ac that are to be reclaimed to upland.\ <br /> Upland reclamation is limited to the 2.87 acres of the berms.As described in Figure 14 Exhibit El,4.02 <br /> acres of upland buffer area is not expected to require active reclamation due to lack of surface <br /> disturbance.Incidental seeding and/or weed treatment is the only treatment anticipated for this <br /> acreage. <br /> 69. Also include a task for any overburden and the required topsoil replacement of the 6.5 ac <br /> uplands area. <br /> Figure 14 Exhibit E1 and Figure 15 Exhibit FI have been updated to clarify that upland reclamation is <br /> limited to the 2.87 acres of berm. <br /> 70. Include a task for ripping/decompaction of affected lands prior to topsoil application. See the <br /> associated adequacy item in Exhibit E. <br /> Table 7 in Section 13 has been updated to include a task and cost estimate for decompaction of the <br /> berms prior to surfacing. <br /> 71. Per the Mining Plan slopes will be graded while mining. Based on the reclamation plan please <br /> include incidental grading of slopes within the cost estimate. <br /> a. The incidental grading for the wetlands shelf is only enough material to apply 6"of <br /> topsoil over the 0.70 ac, no additional grading of pond slopes was included. <br /> The underlying grading of the 5:113:1 wetland slope and inner pond will be created during mining. The <br /> reclamation of the wetland shelf will only require the application of 6"of topsoil material over the <br /> 0.70 acres. The volumes and cost estimates are accurate as currently included in Table 7 and Section <br /> 13. <br /> 72. Section 6.1.1.3 states that piezometers have been installed. Please include a task for the <br /> reclamation these features under Exhibit L-Reclamation Cost Estimate. <br /> The piezometers were installed by Scott to provide information for the wetlands mapping and general <br /> groundwater levels. The locations of the piezometers are outside the Affected Area and have been <br /> added to the mining maps. No reclamation is required, therefore no cost estimate is provided in <br /> Exhibit L. <br /> 6.4.13 EXHIBIT M- Other Permits and Licenses <br /> 73. Please include all applications or issued water rights to support this project. Le.SWSP, decree, <br /> Gravel Well Pond Permit. <br /> SGM has included a copy of the SWSP and the DWR GWS Form 27 applications in Attachment C. <br /> 6.4.17 EXHIBIT Q-Proof of Mailing of Notices to Board of County Commissioners and <br /> Soil Conservation District <br /> 74. Attachment D has two mailings to Glenwood Springs and one to Silt.What is the USPS mailing to <br /> Glenwood Springs for? It's assumed that the USPS tracking for Silt is the Soil Conservation <br /> District.A FedEx Tracking was provided for Garfield BOCC. Unsure what the third mailing receipt <br /> would be for under the requirements of Rule 6.4.17. <br /> The following tracking information for the Proof of Mailing Notices is as follows: <br /> 13 <br />