Laserfiche WebLink
EXHIBIT E RECLAMATION PLAN <br /> 1 . General Reclamation Plan <br /> The disturbed area to be reclaimed under this permit is 78.3 acres out of the 135-acre permit <br /> and affected area. Reclamation of the Chambers Pit will convert all disturbed areas to a post <br /> mining land use of Recreation. This is consistent with the requirements of Eagle County, the <br /> landowner. Mining has completed onsite and final reclamation is underway. <br /> Table E-1 below summarize the final land uses within the affected area upon completion of <br /> reclamation. <br /> Table E-1 Reclamation Areas <br /> Description Area <br /> Access Roads 1.0 <br /> Reve etated 77.3 <br /> Disturbed Area Total 78.3 <br /> Undisturbed&Prev.Reclaimed Area 56.7 <br /> Total Affected Permit Area 135 <br /> Reclamation of all mining areas includes backfilling and grading of slopes, topsoiling, and <br /> seeding for revegetation. All final mining slopes have been backfilled and graded to their final <br /> reclaimed 3H:1 V slopes or shallower. Stockpiled topsoil will be spread across disturbed areas in <br /> a 4 to 6-inch lift in a manner that restores the pre-mine soil profile. All areas will be seeded to <br /> revegetate the site. Refer to Map F-1 for the Hayden Gravel Pit reclamation conditions. <br /> Backfilling and grading is complete onsite. <br /> 2. Topsoil Replacement <br /> Four to six inches of topsoil will be replaced on all disturbed areas being reclaimed. Topsoil will <br /> be sourced from stockpiles kept onsite. Topsoil will be replaced on areas that have been <br /> backfilled and graded for reclamation. Topsoil will be replaced by dozers and haul trucks. <br /> Topsoiled areas will be disced to a depth of 12 inches to aid in root penetration. <br /> 3. Haul Roads and Access <br /> All access roads will be maintained after reclamation to provide site access. <br /> Chambers Pit <br /> May 2023 E-1 Lewicki&Associates <br />