My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-05-16_REVISION - M1980136
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980136
>
2023-05-16_REVISION - M1980136
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2023 8:40:24 PM
Creation date
5/17/2023 8:16:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980136
IBM Index Class Name
Revision
Doc Date
5/16/2023
Doc Name
Request for Technical Revision
From
Oldcastle SW Group, Inc dba United Companies
To
DRMS
Type & Sequence
TR5
Email Name
LDS
AME
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT E RECLAMATION PLAN <br /> 1 . General Reclamation Plan <br /> The disturbed area to be reclaimed under this permit is 78.3 acres out of the 135-acre permit <br /> and affected area. Reclamation of the Chambers Pit will convert all disturbed areas to a post <br /> mining land use of Recreation. This is consistent with the requirements of Eagle County, the <br /> landowner. Mining has completed onsite and final reclamation is underway. <br /> Table E-1 below summarize the final land uses within the affected area upon completion of <br /> reclamation. <br /> Table E-1 Reclamation Areas <br /> Description Area <br /> Access Roads 1.0 <br /> Reve etated 77.3 <br /> Disturbed Area Total 78.3 <br /> Undisturbed&Prev.Reclaimed Area 56.7 <br /> Total Affected Permit Area 135 <br /> Reclamation of all mining areas includes backfilling and grading of slopes, topsoiling, and <br /> seeding for revegetation. All final mining slopes have been backfilled and graded to their final <br /> reclaimed 3H:1 V slopes or shallower. Stockpiled topsoil will be spread across disturbed areas in <br /> a 4 to 6-inch lift in a manner that restores the pre-mine soil profile. All areas will be seeded to <br /> revegetate the site. Refer to Map F-1 for the Hayden Gravel Pit reclamation conditions. <br /> Backfilling and grading is complete onsite. <br /> 2. Topsoil Replacement <br /> Four to six inches of topsoil will be replaced on all disturbed areas being reclaimed. Topsoil will <br /> be sourced from stockpiles kept onsite. Topsoil will be replaced on areas that have been <br /> backfilled and graded for reclamation. Topsoil will be replaced by dozers and haul trucks. <br /> Topsoiled areas will be disced to a depth of 12 inches to aid in root penetration. <br /> 3. Haul Roads and Access <br /> All access roads will be maintained after reclamation to provide site access. <br /> Chambers Pit <br /> May 2023 E-1 Lewicki&Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.