My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-05-16_REVISION - M2016054
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2016054
>
2023-05-16_REVISION - M2016054
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2023 10:00:16 AM
Creation date
5/16/2023 9:58:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2016054
IBM Index Class Name
Revision
Doc Date
5/16/2023
Doc Name
Notice of Decision
From
DRMS
To
Holcim - WCR, Inc.
Type & Sequence
TR1
Email Name
JPL
JLE
Media Type
D
Archive
No
Supplemental fields
Permit Order
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br /> <br />May 16, 2023 <br /> <br /> <br />Kevin Peart <br />Holcim - WCR, Inc. <br />1687 Cole Blvd., Suite 300 <br />Golden, CO 80401 <br /> <br /> <br />Re: Irwin/Thomas Mine - File No. M-2016-054 <br /> Holcim - WCR, Inc. <br /> Technical Revision (TR-1) <br /> Technical Revision to Update Mining and Reclamation Plans for MA-1 <br /> <br />Dear Kevin Peart: <br /> <br />On May 16, 2023 the Division of Reclamation, Mining and Safety concluded its review of the <br />Technical Revision application submitted to the Division on December 19, 2022, addressing the <br />following: <br /> <br />Technical Revision 1 updates the Mining and Reclamation Plans for Mining Area 1 to account for <br />AR-1 (approved) and the pending AR-2. Additionally, it updates the groundwater monitoring plan, <br />accounts for the installation of an underdrain around the new slurry wall configuration, reduce mining <br />offset along Hwy 119 from 200 to 100 feet, provides for bonding for the slurry wall, increases the <br />disturbed acreage and updates the reclamation cost estimate for Cells 1 through 3. Finally, a <br />committment to submit a Technical Revision prior to mining Cells 4 and 5 was agreed upon. <br /> <br />The decision reached by the Division is: approve. <br /> <br />The terms of Technical Revision No. 1 approved by the Division are hereby incorporated into Permit <br />No. M-2016-054. All other conditions and requirements of Permit No. M-2016-054 remain in full <br />force and effect. <br /> <br />The revised liability amount exceeds the financial warranty currently held (see below), please submit <br />additional bond or a rider to your existing bond that equals or exceeds the Revised Liability. The <br />revision will not be final until the bond is approved by the Division. <br /> <br /> <br />Bond Held: $2,747,911.00 <br />Prior Liability: $2,747,911.00 <br />Change in Liability: $5,428,293.00
The URL can be used to link to this page
Your browser does not support the video tag.