Laserfiche WebLink
Wattenberg Mine, Exhibit G—Water Information May 2023 <br /> • Modifying a well to operate under lower groundwater conditions. This could include deepening existing <br /> wells or lowering the pumps. All work would be completed at Holcim's expense except for replacing <br /> equipment that was non-functional prior to mining. <br /> • If existing wells cannot be retrofitted or repaired, replace the impacted well with a new replacement well. <br /> • Design and installation of a cistern. <br /> If a groundwater mitigation action is required, Holcim will notify the DRMS of the condition, action taken, and will <br /> report the results and present a plan for monitoring the mitigation. <br /> OTETRA TECH Page 818 <br />