Laserfiche WebLink
-4- <br /> 12. Primary future(Post-minin land use check one): <br /> Cropland(CR) D Pastureland(PL) General Agriculture(GA) <br /> F] Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br /> -0 Residential(RS) Recreation(RC) Industrial/Commercial(IC) <br /> -0 Developed Water Resources(WR) Solid Waste Disposal(WD) <br /> 13. Primary present land use check one : <br /> Cropland(CR) Pastureland(PL) General Agriculture(GA) <br /> Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br /> Residential(RS) Recreation(RC) Industrial/Commercial(IC) <br /> Developed Water Resources(WR) <br /> 14. Method of Mining: Briefly explain mining method(e.g.truck/shovel): <br /> open pit with loader <br /> 15. On Site Processing: 21 Crushing/Screening <br /> 13.1 Briefly explain mining method(e.g.truck/shovel): open Pit with loader conveyed to Holdrn's Platte Valley Plant <br /> List any designated chemicals or acid-producing materials to be used or stored within permit area: <br /> N.A. <br /> 16. Description of Amendment or Conversion: <br /> If you are amending or converting an existing operation,provide a brief narrative describing the proposed change(s). <br /> Mining was completed previously for most of the propeft with only a small amount of additional <br /> mining planned (6.2 acres) to create the area required to complete Pond 1 (also known as the <br />