My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-07-12_PERMIT FILE - C1981019A (9)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2022-07-12_PERMIT FILE - C1981019A (9)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2023 10:27:29 AM
Creation date
5/10/2023 1:49:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
7/12/2022
Doc Name
Performance Standards
Section_Exhibit Name
Volume 15 Rule 4
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RULE 4 PERFORMANCE STANDARDS <br /> <br />Collom – Rule 4, Page 6 Revision Date: 6/20/22 <br /> Revision No.: MR-242 <br />4.05.6 Sedimentation Ponds <br /> <br />The location, design parameters, and detailed sedimentation calculations of all planned sedimentation <br />ponds are presented in Erosion and Sedimentation Control Plan (Exhibit 7, Item 23). The design plans <br />and specifications for the sedimentation ponds are described in this section (Part C). All sedimentation <br />ponds will be located as close as practical to the areas to be disturbed. Steep terrain in the upper basins <br />precludes location of the ponds at the Collom Pit disturbance boundaries during the critical early phase of <br />operations, necessitating down-valley locations downstream of the Collom Pit and temporary spoil pile <br />footprint. Other methods of sediment control will be located on the reclaimed areas; these methods <br />include the use of contour furrowing, contour drainage ditches, chisel plowing, and revegetation. <br /> <br />Colowyo has specificially provided information regarding Rule 4.05.9(7)(a-e) with respect to the <br />construction of sediment ponds on the design drawings. Please see Exhibit 7-23C, Table 1 and Exh. 7-23 <br />Figures C5 through C9. <br /> <br />Exhibit 7, Item 23, Part C contains calculations used to determine runoff volumes and flow rates for the <br />theoretical 10-year, 25-year, and 100-year, 24-hour precipitation events, as well as annual sediment <br />volumes. The precipitation data were obtained from the NOAA Atlas 2, Volume 3 for Colorado; soil <br />types were obtained from the Soil Conservation Service, and are shown on the soils survey map (Map <br />5D). <br /> <br />The ongoing mining activities within each watershed of the permit area will create constantly changing <br />hydrologic conditions. The design models are generally based on a static, theoretical scenario, utilizing <br />SEDCAD 4. Please refer to Exhibit 7, Item 23 for a delineation of the areas used for these modeling <br />purposes, the presentation of the assumed worse case scenario, as well as the maps associated with the <br />SEDCAD runs. <br /> <br />The scenario used for the sedimentation ponds corresponds to an active, disturbed operation. In terms of <br />groundwater, Colowyo’s pits have remained essentially dry. Discharges from the ponds will remain in <br />compliance with Colowyo’s CDPS Discharge Permit. The use of flocculants in sedimentation ponds may <br />also be used in accordance with the provisions of the CDPS Permit. <br /> <br />Sediment will be removed from all sedimentation ponds on an as needed basis or when the sediment level <br />will not allow effective treatment of the runoff resulting from the 10-year, 24-hour precipitation event in <br />accordance with Rule 4.05.2. Quarterly inspections will note the level of sediment in each pond. Ponds <br />will typically be cleaned of sediment when water levels are lowest, and the least amount of precipitation <br />is expected. The removed sediment may be used as topsoil or subsoil if it meets the suitability criteria <br />discussed under Section 2.04.9 or placed in the backfill of the pits. The Division will be notified of this <br />determination if the material is selected as overburden material that can be substituted for or as a <br />supplement to topsoil. <br /> <br />All sedimentation ponds will be designed so that the minimum elevation at the top of the settled <br />embankment is at least one foot above the elevation of the water surface in the pond with the emergency <br />spillway flowing at design depth. <br /> <br />Colowyo will design, construct, and maintain the sedimentation ponds to prevent short-circuiting to the <br />extent possible. As a general rule, the inflow to the ponds will be at the opposite end from the outflow <br />area. The constructed height of the sedimentation pond embankment will be designed to allow for <br />settling. During construction, a registered professional engineer will ensure that the appropriate <br />embankment height is accomplished. For all sedimentation ponds, the entire embankment, including the <br />surrounding areas disturbed by construction, will be seeded after the embankment is completed, using the
The URL can be used to link to this page
Your browser does not support the video tag.