2022-07-12_PERMIT FILE - C1981019 (24)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2022-07-12_PERMIT FILE - C1981019 (24)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2023 9:20:49 AM
Creation date
5/10/2023 9:16:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Permit File
Doc Date
7/12/2022
Doc Name
Sediment 26 Pond Sediment Control During Mining
Section_Exhibit Name
Volume 18 Exhibit 7 Item 23 Part C
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exh. 7-23C-2 Revision Date: 4/28/22 <br /> Revision No.: TR-154 <br />The selection of "L" and "S" for input into the SEDCADTM model for the near repose angle slopes <br />of a benched spoil pile is also complex. The values of 145 feet for "L" and 31% for "S" were <br />selected for the dumped spoil pile lifts to approximate the combined LS factor that would apply to <br />a compound slope, in this case a concave slope with a very steep (repose angle) upper part and a <br />very flat lower part (bench). SEDCADTM cannot handle a compound slope directly, but a method <br />to do so is described in Chapter 5 of "Hydrology and Sedimentology for Disturbed Areas" by <br />Barfield, Warner and Haan, 1981. The method uses the original 1965 Wischmeier and Smith <br />USDA Handbook No. 282 formula, then adjusts each segment with a factor, and finally provides <br />a weighted average for the compound slope. <br /> <br />The above described method was applied to a 65 foot upper segment at repose angle (77%) <br />followed by an 85 foot flat bench at 1%, resulting in a weighted average LS of 9.0. Several possible <br />combinations of a single L and a single S were then examined for input into SEDCADTM to arrive <br />at a similar LS factor. It was found that a single line with L of 145 feet with a drop of 45 feet, <br />producing a S of 31% produces a LS of 10.1, which is slightly higher than the calculated value of <br />9.0 for the actual compound slope. That line also happens to be close to a simple straight line from <br />the crest of one bench to the crest of the next one lower down the face, so it has some physical <br />relevance to the actual spoil pile face. The L and S of 145 feet and 31%, producing a LS factor <br />about 12% greater than the actual compound concave slope calculated were then conservatively <br />used in the modeling of all spoil pile faces. <br /> <br />Section 26 Pond – During Mining <br /> <br />The location of the Section 26 Pond and its watershed is presented on Map 41B. The temporary <br />channels that route water to the Section 26 Pond are presented on 41B. <br /> <br />The as-built configuration for the Section 26 Pond is presented on Figure 7-23J-1, and the as-built <br />configuration for the Sidehill Pond is presented on Figure 7-23J-2. Figure 7-23D-1 provides the <br />breakdown of drainage areas and hydrologic conditions for all areas in the watershed reporting to <br />these two sediment ponds during mining. The Sidehill Pond is part of the Section 26 Pond <br />sediment control system and is utilized to reduced peak flows and provide additional sediment <br />storage if need. All discharges from the Sidehill Ponds flow directly to the Section 26 Pond <br />through the D-1 Ditch, and the Section 26 Pond is the final discharge location. <br /> <br />The SEDCADTM model herein provides the results of the 10-year 24-hour design storm and <br />demonstrates the Section 26 Pond will meet the applicable settleable solids standard under this <br />modeled storm event. The second SEDCADTM model demonstrates that the Section 26 Pond <br />emergency spillway elevation is capable of containing the 25-year 24-hour storm. <br /> <br />In summary, for the mining case at the Section 26 Pond, the 10-year 24-hour storm produces 2.2 <br />acre feet of runoff, and the peak settleable solids concentration is 0.00 ml/l. The 25-year 24-hour <br />storm event peaks at the 6,984.1 elevation, which is below the emergency spillway elevation of <br />6,986.0’ <br /> <br /> <br />