Laserfiche WebLink
Riser <br />Diameter <br />(in) <br />Riser Height <br />(ft) <br />Barrel <br />Diameter <br />(in) <br />Barrel <br />Length (ft) <br />Barrel Slope <br />(%)Manning's n Spillway Elev <br />(ft) <br />Number of <br />Holes per <br />Elev <br />18.00 10.00 18.00 198.00 5.00 0.0150 7,061.00 2 <br />Emergency Spillway <br />Spillway Elev Crest Length <br />(ft) <br />Left <br />Sideslope <br />Right <br />Sideslope <br />Bottom <br />Width (ft) <br />7,066.00 38.00 3.00:1 3.00:1 24.00 <br /> Pond Results: <br />Peak Elevation: 7,062.87 ft <br />H'graph Detention Time: 0.00 hrs <br />Pond Model: CSTRS <br />Dewater Time: 1.29 days <br />Trap Efficiency: 0.00 % <br />Dewatering time is calculated from peak stage to lowest spillway <br />Elevation-Capacity-Discharge Table <br />Elevation Area <br />(ac) <br />Capacity <br />(ac-ft) <br />Discharge <br />(cfs) <br />Dewater <br />Time <br />(hrs) <br />7,048.00 0.000 0.000 0.000 Top of Sed. Storage <br />7,049.00 0.009 0.003 0.000 <br />7,050.00 0.021 0.018 0.000 <br />7,051.00 0.035 0.045 0.000 <br />7,052.00 0.050 0.088 0.000 <br />7,053.00 0.063 0.144 0.000 <br />7,054.00 0.078 0.214 0.000 <br />7,055.00 0.095 0.301 0.000 <br />7,056.00 0.113 0.405 0.000 <br />7,057.00 0.132 0.527 0.000 Low hole SPW #1 <br />7,058.00 0.158 0.672 0.473 3.71* <br />7,059.00 0.183 0.842 0.669 4.40 <br />7,060.00 0.210 1.038 0.819 4.55 <br />7,061.00 0.248 1.267 0.945 7.35 Spillway #1 <br />7,062.00 0.284 1.533 8.509 9.70 <br />7,062.87 0.322 1.797 11.559 1.25 Peak Stage <br />7,063.00 0.327 1.838 12.033 <br />7,064.00 0.371 2.187 14.738 <br />7,065.00 0.417 2.581 17.018 <br />7,066.00 0.465 3.022 19.026 Spillway #2 <br />7,067.00 0.552 3.529 71.605 <br />Filename: Exhibit 7 Item 23 Part B 10-Yr 24-Hr Section 25 During Mining.sc4 Printed 03-17-2022 <br />SEDCAD 4 for Windows <br />Copyright 1998 -2010 Pamela J. Schwab <br />Civil Software Design, LLC 22