Laserfiche WebLink
Revision Date: 4/28/22 <br /> Revision No.: TR-154 <br />EXHIBIT 23, ITEM 3 <br />GEOTECHNICAL REPORT - COLLOM OUT OF PIT DUMP AND FINAL <br />RECLAIMED SURFACE <br /> <br />The following report by Agapito Associates, Inc. provides an addendum to the geotechnical <br />report presented in Exhibit 23, Item 1. The location of the excess spoil pile is shown on Map <br />29C.