My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-05-04_REVISION - M1994121
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1994121
>
2023-05-04_REVISION - M1994121
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/25/2023 11:45:03 AM
Creation date
5/8/2023 7:48:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994121
IBM Index Class Name
Revision
Doc Date
5/4/2023
Doc Name
Notice of Surety Increase
From
DRMS
To
Arthur Vasquez - O & A Stone LLC
Type & Sequence
SI2
Email Name
JPL
JLE
SMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bulldozer Worksheet Cont'd Task#002 Page 2 of 2 <br /> Material consistency: 1.000 (CAT HB) <br /> Dozing method: 1.000 (GEN.) <br /> Visibility: 1.000 (AVG.) <br /> Job efficiency: 0.830 (1 SHIFT/DAY) <br /> Spoil pile: 0.600 (FND-SF) <br /> Push gradient: 1.115 (CAT HB) <br /> Altitude: 1.000 (CAT HB) <br /> Material Weight: 1.438 (CAT HB) <br /> Blade type: 1.000 (PAT) <br /> Net correction: 0.5989 <br /> Adjusted unit 427.79 LCY/hr <br /> production: <br /> Adjusted fleet 855.58 LCY/hr <br /> production: <br /> JOB TIME AND COST <br /> Fleet size: 2 Dozer(s) <br /> Unit cost: $0.516/LCY <br /> Total job time: 3.88 Hours <br /> Total job cost: $1,714 <br />
The URL can be used to link to this page
Your browser does not support the video tag.