Laserfiche WebLink
b) The Board will enter the lands to perform reclamation only if the Board has determined that: <br /> i. Reclamation required by the permit,statute,or regulations to be performed upon such lands <br /> has not been performed,or <br /> ii. Financial warranty forfeiture proceedings described in the Act or similar provisions of <br /> subsequent laws, if any,have been initiated. <br /> c) The Division,acting for the Board,will enter lands to respond to an emergency only where the <br /> Division determines that any of the conditions of Construction Materials Rule 8.4.2 exist. <br /> 7) The additional conditions set forth in the attached rider, if any,are incorporated herein by reference. <br /> a) Rider is attached. <br /> XX b) No rider is attached. <br /> MINED LAND RECLAMATION BOARD <br /> COLORADO DEPARTMENT OF NATURAL RESOURCES <br /> 4 <br /> / Virginia Brannon <br /> Division Director <br /> [31 <br />