My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-04-19_PERMIT FILE - C1981010 (40)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981010
>
2023-04-19_PERMIT FILE - C1981010 (40)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2023 2:33:25 PM
Creation date
5/3/2023 10:18:01 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Permit File
Doc Date
4/19/2023
Doc Name
PR11 Permit Expansion Area Baseline Soils Map
Type & Sequence
PR11
Section_Exhibit Name
Map M29B Sheet 1 of 1
Media Type
M
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
61506200620062506250625062506250625063006300630063006300630063006300630063006300630063506350635063506350635063506350635063506400640064006400640064006400645064506450645064506450645065006500650061506150U. P. RailroadYAMPA RIVER <br />HWY 13 <br />E 1412000 <br />E 1414000 <br />E 1416000N 410000N 412000N 414000E 1410000 <br />E 1408000 <br />E 1412000 <br />E 1414000 <br />E 1416000N 410000N 412000N 414000E 1410000 <br />E 1408000 <br />Trapper MineSCALE: 1" = 400'DATE: 10/31/2021PR-11WTCPERMIT REVISIONTrapper MineSCALE: 1" = 400'DESIGNED BY: FLDRAWN BY: WTC10/31/2021PR11 PERMIT EXPANSION AREABASELINE SOILS MAPN 410000N 412000N 414000E 1412000 <br />E 1414000 <br />E 1416000 <br />E 1410000 <br />E 1408000 <br />E 1406000E 1404000N 416000N 416000N 416000N 414000N 412000N 410000E 1412000 <br />E 1414000 <br />E 1416000 <br />E 1410000 <br />E 1408000 <br />E 1406000E 1404000 E 1406000E 1404000 <br />THIS AREA REPRESENTED IN M29THIS AREA REPRESENTED IN M294000400800Note: Production may fluctuate according to economic,geologic, or other conditions. Limits are shown forOperations may actually progress slower than depictedon these maps. Backfilling, grading, and topsoillaydown will follow mining operations in a timelymanner.4000400800123L:ENGINEERING \ PERMITS \ PR11 \ PR11Maps \ M29B \ M29B_PR11.dwgNote: Production may fluctuate according to economic,geologic, or other conditions. Limits are shown formaximum possible production from 2023 through 2027.Operations may actually progress slower than depictedon these maps. Backfilling, grading, and topsoillaydown will follow mining operations in a timelymanner.PERMIT BOUNDARY42aBorollic Camborthids, coarse - loamy, mixed 0 - 9% slopes ( 5.26 ACRES)SOILS MAPPING WITHIN THE PR-11 MINE EXPANSION AREA (ACREAGES GIVEN)6aForelle loam, 0 - 9% slopes ( 91.19 ACRES)6bForelle loam, 10 - 20% slopes ( 1.03 ACRES)25aRentsac Variant fine sandy loam, 0 - 9% slopes ( 0.00 ACRES)25bRentsac Variant fine sandy loam, 10 - 29% slopes ( 6.53 ACRES)42bBorollic Camborthids, coarse - loamy, mixed 10 - 29% slopes ( 25.02 ACRES)Disturbance ( 8.05 ACRES)Topographic information compiled from aerial photography dated October 2017and USGS Historic TopographyLEGENDPROPOSED PERMITBOUNDARY EXPANSIONSoil MapNumberSoil Mapping Unit TypeAcreage within PR-11Expansion Area6a6b42b25bD6a42b25bD6a42aD42aDTotal( 137.08 ACRES)DSOILS TYPE BOUNDARYU. P. Railroad <br />25a
The URL can be used to link to this page
Your browser does not support the video tag.