Laserfiche WebLink
April 27, 2023 C-1983-059/Terror Creek Loadout LDS <br /> Inspection Topic Summary <br /> NOTE: Y=Inspected N=Not Inspected R=Comments Noted V=Violation Issued NA=Not Applicable <br /> N -Air Resource Protection N -Roads <br /> R -Availability of Records N -Reclamation Success <br /> N -Backfill &Grading N -Revegetation <br /> N -Excess Spoil and Dev.Waste N - Subsidence <br /> N -Explosives N - Slides and Other Damage <br /> N -Fish &Wildlife R - Support Facilities On-site <br /> R -Hydrologic Balance N - Signs and Markers <br /> N -Gen. Compliance With Mine Plan N - Support Facilities Not On-site <br /> N - Other N - Special Categories Of Mining <br /> N -Processing Waste N -Topsoil <br /> COMMENTS <br /> This was a complete inspection by Leigh Simmons of the Division of Reclamation, Mining and Safety (Division), <br /> accompanied by Doug Smith of Oxbow Mining (Oxbow). The weather was clear and dry. There was no activity at <br /> the site, and no sign of any recent disturbance. <br /> AVAILABILITY OF RECORDS—Rule 5.02.4(I): <br /> Records were available at the Elk Creek mine office. Details are given at the end of this report. <br /> HYDROLOGIC BALANCE-Rule 4.05 <br /> Drainage Control 4.05.1, 4.05.2,4.05.3; Siltation Structures 4.05.5, 4.05.6; Discharge Structures 4.05.7, 4.05.10; <br /> Diversions 4.05.4; Effluent Limits 4.05.2; Ground Water Monitoring 4.05.13; Surface Water Monitoring 4.05.13; <br /> Drainage—Acid and Toxic Materials 4.05.8; Impoundments 4.05.6, 4.05.9; Stream Buffer Zones 4.05.18: <br /> Despite the wet spring weather there was nothing but cracked mud in the bottom of the sediment pond. <br /> SUPPORT FACILITIES -Rule 4.04: <br /> The lock on the gate at the entrance to the site had been replaced after it had been cut open. <br /> There was evidence that the office building had been broken into,but nothing appeared to have been damaged or <br /> stolen. <br /> DOCUMENTS RECEIVED <br /> N/A <br /> OTHER(SPECIFY) <br /> N/A <br /> ENFORCEMENT ACTIONS/COMPLIANCE <br /> No enforcement actions were initiated as a result of this inspection,nor are any pending. <br /> Number of Partial Inspection this Fiscal Year: 6 <br /> Number of Complete Inspections this Fiscal Year: 4 <br /> Page 2 of 5 <br />