Laserfiche WebLink
of c°\o <br /> C'OLORADO DIVISION OF REC t,AMATIO`, MI`ING AND SAFETY <br /> «x\ '• +jI 'W, Shcr1min S[CccI, Room 21� Demer Color;ldo Sit'01 P11(A0i) x00-3W <br /> /876-;- <br /> REQUEST FOR TECHNICAL REVISION' (TR) COVER SHEET TRA <br /> File No . M- 2019-001 site Name Lazy Two Pit PSH/JLE <br /> Weld <br /> COMM "TRH- <br /> Permittee: <br /> Connell Resources, Inc. RECEIVEn <br /> Operator (If Other than Pernlittee): MAY 02 Z023 <br /> Permittee Representati\e: <br /> Blue Earth Solutions, LLC DIVISION OF ReCLAMATION <br /> MINING &SAFE.I GALS <br /> Please provide a brief description of the proposed revision: <br /> Ownership of the Lazy Two Ranch has been purchased by Connell Resources, Inc. <br /> As defined b,. the Minerals Rules, a Technical Revision JR) is. "a change in the permit or application <br /> \\hich does not ha\e more than a minor effect upon the appro\ed or proposed Reclamation or <br /> En\ironmental Protection Plan .. The Di\ision is charued \\Ith deter11111 im-, if the re\ision as submitted <br /> meets this definition. ifthe Di\ision determines that the proposed re\ision is beyond the scope ofa TR, <br /> the Di\ision trim require the subillittal of a permit amendment to make the required oi- desired changes <br /> to the permit. <br /> The request for a TR is not considered "tiled for re\ie\v" until the appropriate fee is received by the <br /> Di\ision (as listed below by permit type►. Please submit the appropriate fee with your request to <br /> expedite the re\ie\\ process. After the TR is submitted \\ith the appropriate fee. the Di\ision will <br /> determine if it is approvable within 3O days. if the Dix ision requires additional information to approve a <br /> TR. you \vile be notified of specific deficiencies that \\ill need to be addressed. If at the end of the 30 <br /> day re\ie\v period there are still outstanding deficiencies, the Di\ision nulut deny the TR unless tine <br /> pernlittee regrieStS additional tiille. In xvi'ltill!„ to provide the required information. <br /> There is no pre-defined format for the submittal of a TR. ho\\e\er, it is up to the permittee to provide <br /> sufficient information to the Division to appro\e the TR request. including updated mining and <br /> reclamation plan neaps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Re\ision b\ Permit Type - Please mark the correct fee and submit it with <br /> v0ur request for a Technical Revision. <br /> Permit T%ve Required TR Fee Submitted (mark only one) <br /> 1 1 Oc. 1 11, 1 1_' constructiuil ❑ <br /> materials, and 1 1 2 quarries S?16 <br /> 112 hard rock (not DNIO) S175 ❑ <br /> i I Od, i i 2d( I, 2 or 3) S 1006 ❑ <br />