Laserfiche WebLink
With this letter and the enclosed technical documentation, the Operator urges the Division to <br /> accept TR2 as adequate. <br /> Discussions with the Division have been productive and collaborative. Noting that comity, the <br /> Operator also requests the Division to acknowledge that longer term sampling to verify water <br /> quality conditions need not delay mining operations from commencing at Nix on May 2, 2023. <br /> Enclosed: Sampling and Analysis Plan <br /> 2 <br />