Laserfiche WebLink
A narrative describing site grading,topsoil replacement, successful revegetation and other stabilization <br /> activities,as appropriate; <br /> The NO1 consisted of four items: <br /> 1. 6 shallow rotary drill holes placed in March of 2013,with depths not exceeding 25 feet. Holes <br /> 1-3 were drilled in the old mine permit area for the Precious Mine and holes 4-6 were drilled to <br /> the west of the mine area. See attached Reclamation Map.The holes were drilled in the <br /> approximate locations shown on the Map. <br /> 2. A shale excavation area of 15 tons maximum located immediately south of the mine permit area <br /> 3. Commitment to reclaim some old cuts and mounds adjacent to the shale excavation area. <br /> 4. Use some topsoil mounds left in the mine area in the reclamation of the shale excavation area. <br /> All reclamation work was performed by Gerald Korinek,who works for JH Sand and Gravel, and has been <br /> associated with the property since the initial drilling occurred. <br /> Item 1-All holes were drilled in shale and no water was encountered in any hole.The drill holes were <br /> filled with a mixture of sand, silt and clay to the surface,which was then compacted.Topsoil was placed <br /> to a depth of 4 inches and grass plugs were placed in each hole area. In addition,some seed (from the <br /> prescribed mix)was placed around the holes.As seen in the hole reclamation pictures,there are no <br /> disturbances outside of the immediate hole areas.The Drill Hole Abandonment Report is attached to this <br /> submittal. <br /> Page 3 of 17 <br />