My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-04-28_INSPECTION - C1981019 (2)
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981019
>
2023-04-28_INSPECTION - C1981019 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2023 9:43:55 AM
Creation date
4/28/2023 2:23:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Inspection
Doc Date
4/28/2023
Doc Name
Inspection Report
From
DRMS
To
Colowoy Coal Company
Inspection Date
4/20/2023
Email Name
ZTT
AME
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
w <br /> Debris froze on trash rack of Prospect Pond spillway. <br /> The West Pit pond was inspected.The West Pit pond is the lower pond that receives drainage from a portion of the <br /> West Pit located along the Taylor Creek Drainage. This pond held water with no discharge and was stable. <br /> Section 36,Middle and Section 25 Ponds were inspected. These ponds are located near the Collom Pit and receive <br /> surface runoff from the Collom Pit and associated facilities.All three ponds were discharging during the time of the <br /> inspection.No issues were observed. <br /> GENERAL MINE PLAN COMPLIANCE: <br /> The dragline was being transported to the Collom Pit at the time of the inspection.The dragline was being staged <br /> near the Collom Pit to assist with backfill at the Collom Pit for contemporaneous reclamation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.