Laserfiche WebLink
Schedule 1.2(d)(ii) <br /> Schedule I cont'd <br /> Page 3 of Form of Deed of Trust <br /> Name of Minei al Survey <br /> [Attached) <br /> OCIIIJ., �•••••�•-• <br /> This Form of Deed a/Trust will be conformed to the transaction after the Due Diligence Period. <br /> Wheel of Fortune 343A(11.1> ;._'lo,:/.`H) <br /> Wheel of FortuneMillsite 343B(dw/?l1 e„1,,y„--"t•,ot 1t>111 O <br /> Ymil 1649A <br /> All rights owned by Revenue which were reserved by the Revenue Tunnel-Mines <br /> Company In that certain warranty deed dated August 28,191 1;recorded In Book <br /> 103,pages 432 and 433,by and between Revenue Tunnel Mines Company and <br /> the Tomboy Ookr Mines Company, Ltd., and relating generally to the <br /> intersections of the so-called V irginius veln'and the intersection of such vein with <br /> the Link(U.S.Suivey No.11536)and the Cruller and the Doughnut(U.S.Su,vey <br /> No.12163)lode miningclaims, <br /> -18- -19- <br /> Exhibit 2 Exhibit 2 <br /> Page 48 of 65 Page 49 of 65 <br />