Laserfiche WebLink
Bulldozer Worksheet Cont'd Task#040 Page 1 of 2 <br /> BULLDOZER WORK <br /> Task description: Regrade I/J Roads(I/J Spoil,I Mid,I West) <br /> Site: Trapper Mine Permit Action: PR11 Permit/Job#: C1981010 <br /> PROJECT IDENTIFICATION <br /> Task#: 040 State: Colorado Abbreviation: None <br /> Date: 11/22/2022 County: Moffat Filename: COIO-040 <br /> User: ZTT <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D10T- IOSU <br /> Horsepower: 574 <br /> Blade Type: Semi-Universal <br /> Attachment: NA <br /> Shift Basis: 3 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $153.67 NA <br /> Operating Cost/Hour: $166.94 100 <br /> Ripper own.Cost/Hour: $0.00 NA <br /> Ripper op.Cost/Hour: $0.00 1 25 <br /> Operator Cost/Hour: $41.55 NA <br /> Total unit Cost/Hour: $362.16 <br /> Total Fleet Cost/Hour: $1,448.65 <br /> MATERIAL QUANTITIES <br /> Initial Volume: 111,117 <br /> Swell factor: 1.250 <br /> Loose volume: 138,896 LCY <br /> Source of estimated volume: Permit Appendix A,Tables A-2.3, A.6.1 <br /> Source of estimated swell factor: Operator,Appendix A <br /> Table A-6.1 <br /> HOURLY PRODUCTION <br /> Average push distance: 80 feet <br /> Unadjusted hourly production: 2,028.0 LCY/hr <br /> Materials consistency description: Consolidated stockpile 1.0 <br /> Average push gradient: -5% <br /> Average site altitude: 6,725 feet <br /> Material weight: 2,475 lbs/LCY <br /> Weight description: User Provided <br /> Job Condition Correction Factor Source <br /> Operator Skill: 1.000 (EXCL.) <br /> Material consistency: 1.000 (CAT HB) <br /> Dozing method: 1.000 (GEN.) <br />