Laserfiche WebLink
Bulldozer Worksheet Cont'd Task#035 Page 1 of 2 <br /> BULLDOZER WORK <br /> Task description: Regrade N Pit Roads(old LOM,cross-over,ash pit) <br /> Site: Trapper Mine Permit Action: PR11 Permit/Job#: C1981010 <br /> PROJECT IDENTIFICATION <br /> Task#: 035 State: Colorado Abbreviation: None <br /> Date: 11/22/2022 County: Moffat Filename: COIO-035 <br /> User: ZTT <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat DI IT- 11U <br /> Horsepower: 850 <br /> Blade Type: Universal <br /> Attachment: NA <br /> Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $257.09 NA <br /> Operating Cost/Hour: $273.21 100 <br /> Ripper own.Cost/Hour: $0.00 NA <br /> Ripper op.Cost/Hour: $0.00 1 100 <br /> Operator Cost/Hour: $41.30 NA <br /> Total unit Cost/Hour: $571.60 <br /> Total Fleet Cost/Hour: $2,286.41 <br /> MATERIAL QUANTITIES <br /> Initial Volume: 105,283 <br /> Swell factor: 1.150 <br /> Loose volume: 121,075 LCY <br /> Source of estimated volume: Table A-6.1 <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Average push distance: 80 feet <br /> Unadjusted hourly production: 3,441.4 LCY/hr <br /> Materials consistency description: Compacted fill or embankment 0.9 <br /> Average push gradient: 0% <br /> Average site altitude: 6,600 feet <br /> Material weight: 2,475 lbs/LCY <br /> Weight description: User Provided <br /> Job Condition Correction Factor Source <br /> Operator Skill: 0.750 (AVG.) <br /> Material consistency: 0.900 (CAT HB)) <br /> Dozing method: 1.000 (GEN.) <br /> Visibility: 1.000 (AVG.) <br />