My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-04-19_REVISION - C1981010 (6)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2023-04-19_REVISION - C1981010 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2023 7:54:04 PM
Creation date
4/19/2023 7:52:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Revision
Doc Date
4/19/2023
Doc Name
Proposed Decision Letter & Form
From
DRMS
To
Trapper Mining, Inc.
Type & Sequence
PR11
Email Name
RAR
JLE
Media Type
D
Archive
No
Supplemental fields
Permit Order
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />1313 Sherman St. Room 215 Denver, CO 80203 P (303) 866-3567 F (303) 832-8106 https://drms.colorado.gov <br />Jared Polis, Governor | Dan Gibbs, Executive Director | Virginia Brannon, Director <br />April 19, 2023 <br /> <br />Graham C. Roberts <br />Trapper Mining, Inc. <br />P.O. Box 187 <br />Craig, CO 81626 <br /> <br />Re: Trapper Mine (Permit No. C-1981-010) <br /> Proposed Decision <br /> Permit Revision Application No. 11 (PR-11) <br /> <br />Dear Mr. Roberts: <br /> <br />Enclosed you will find the Division of Reclamation, Mining and Safety's Proposed Decision Package for <br />Permit Revision No. 11 at the Trapper Mine. Notice of the proposed decision will be published in the CO <br />Mountain News Media - Craig Daily Press as soon as possible. The thirty (30) day public comment period <br />for the Division's decision will begin on the day following the first publication. <br /> <br />Documentation must be submitted to the Division demonstrating that a copy of the approved revision <br />application was sent to the Office of Surface Mining and the Bureau of Land Management. The material <br />should be sent within 15 days of final approval. <br /> <br />Please be advised that federal mine plan approval may need to be obtained from the Office of Surface Mining <br />Reclamation and Enforcement (OSM). OSM approval, in addition to State permit approval, is required, before <br />operations affecting federal coal may commence. <br /> <br />Please refer to the Performance Bond heading on the enclosed proposed decision form. If the amount of Bond <br />Held equals or exceeds the Revised Liability, you need not submit additional bond. However, if the Revised <br />Liability exceeds the Bond Held, please submit additional bond or rider to your existing bond that equals or <br />exceeds the Revised Liability. This Permit Revision must not be implemented until this proposed decision <br />becomes final and until any required increase in bond is submitted to and approved by the Division. <br /> <br />If there are stipulations attached, please sign and return the proposed decision form to the Division. <br />
The URL can be used to link to this page
Your browser does not support the video tag.