Laserfiche WebLink
<br /> <br />Permit Section 4.8 <br />Page_4-172a_Table_4.8-1 <br />Page_4-174_to 4-174a_Table_4.8-2 <br />Page_4-175_Table_4.8-2A <br />Page_4-177_Table_4.8-3 <br />Page_4-184 <br />Page_4-186a_Table_4.8-6 <br />Page_4-190a_Table_4.8-7 Page 3 of 3 <br />Page_4-240_Table_4.8-11 <br />Page_4-222gg_Table_4.8-8b Surface Water <br />NPDES Sampling Sites <br /> <br />Page_4-225 <br />Page_4-226d to 4-226e <br />Permit Section 4.8.5 <br />Page_4-239 <br />Page_4-240_Table_4.8-11 Monitoring Schedule <br />Surface Water <br />Page_4-241a <br /> <br />Page_4-242 <br />Page_4-245_Table_4.8-13a_Page_2 <br />Page_4-247a <br /> <br />Permit Section 4.9.4 <br />Page_4-261_Table_4.9-3 <br />Page_4-262_Table_4.9-4 <br /> <br />Appendicies: <br />Appendix A: <br />App A Page 28 Table 10.4 <br />App_A_PR11_Bond Estimate <br /> <br />App_A_PR11_Bond_TALPAC_Backup… <br />App_A_PR11_Reclamation_Bond_Regrade <br />Cross Sections <br /> <br />Appendix B <br />App_B_AOC_Variance_Summary <br /> <br />App_B_Attach_2_Eval_Pre Mine_to_Post- <br />Mine_Surface_Hydrology_Characteristics <br /> <br />Appendix Q: <br />App Q Sec I West Buzzard N3 spillway and <br />embankment drawing <br />App Q Sec I West Buzzard N4 spillway and <br />embankment drawing <br />App_Q_Sec_I_West_Buzzard_Hydrologic <br />Model <br />App Q Sec II East Buzzard N3 spillway and