My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-04-05_PERMIT FILE - M2022051 (3)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2022051
>
2023-04-05_PERMIT FILE - M2022051 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2023 8:38:17 PM
Creation date
4/6/2023 7:35:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2022051
IBM Index Class Name
Permit File
Doc Date
4/5/2023
Doc Name
Incompleteness Response
From
J & T Consulting, Inc.
To
DRMS
Email Name
ACY
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:07C464C4-FDB6-434A-A01B-558064E4E858 <br /> Contractor's code number: 090A <br /> Prequal. expiration date: 03/31/2022 <br /> Proposal for Project No. (s) NHPP0131-057 <br /> I, the undersigned bidder for the project(s) listed above, hereby offer this proposal to the Chief <br /> Engineer, Department of Transportation, 4201 East Arkansas Ave., Denver CO 80222. <br /> I UNDERSTAND the bidding and award for this project(s) shall be in accordance with the rules that <br /> implement the "Construction Bidding for Public Projects Act", Sections 24-92-101 et seq., C.R.S. <br /> I FURTHER UNDERSTAND that if this proposal is accepted, the Invitation for Bids, Proposal, Plans, <br /> Standard Specifications, Supplemental Specifications, Special Provisions, Contract Form, and Contract <br /> Bonds shall be part of the complete contract. <br /> I FURTHER UNDERSTAND that failure to include this Form #85 in the proposal will cause this proposal to <br /> be rejected. <br /> IN PREPARING THIS PROPOSAL, I HAVE: <br /> - examined the Plans, Specifications, and the site of the proposed project and I am satisfied as to the <br /> conditions to be met and the work to be accomplished. <br /> - considered any revisions to the Plans and Specifications which were made after advertisement. Number <br /> of revisions: 0 <br /> IF THIS PROPOSAL IS ACCEPTED AND I AM AWARDED THE CONTRACT, I AGREE TO: <br /> - execute a Contract and Bonds on forms provided by the Department of Transportation within 15 calendar <br /> days after the date of award. I understand that failure to do so will be just cause for cancellation of <br /> the award and forfeiture of the proposal guarantee. <br /> - commence work within 20 calendar days (or other time as specified in the Notice to Proceed) after the <br /> award date. I will complete the work in accordance with the time stated in the project Specifications. <br /> - accomplish the work on the project in accordance with the Plans and Specifications, under the <br /> direction and according to the instructions of the Chief Engineer or, authorized representative, at the <br /> unit prices named in this proposal. <br /> - perform any increased or decreased quantities of work at the unit prices named in the Proposal, except <br /> for alterations as provided for in the Specifications. I understand the Bid Schedule of quantities shown <br /> in this proposal is approximate and subject to change and that the Department may, in its sole <br /> discretion, unilaterally increase the funds available under the Contract if the quantities increase. <br /> - furnish all labor, machinery, equipment, materials, and supplies necessary to accomplish the work on <br /> the project. <br /> - provide adequate compensation insurance to protect my employees working on the project. <br /> ACCEPTANCE OF FUEL AND ASPHALT COST ADJUSTMENTS: <br /> Bidders have the option to accept Fuel and Asphalt Cost Adjustments in accordance with the Revisions of <br /> Section 109 for Fuel Cost Adjustments and Asphalt Cost Adjustments. To accept either of these standard <br /> special provisions, the bidder must fill in an "X" next to "YES" below. No Fuel or Asphalt Cost <br /> Adjustments will be made due to fuel or asphalt cost changes for bidders who answer "NO". If no line is <br /> marked for the Fuel or Asphalt Cost Adjustments, the default selection shall be considered a "NO", I <br /> choose not to accept the Cost Adjustments for this project' . When the Fuel or Asphalt Cost Adjustment <br /> specification does not apply to the project, no line should be marked. After bids are submitted, bidders <br /> will not be given any other opportunity to accept or reject these adjustments. <br /> (SELECT YES or NO TO ACCEPT FUEL COST ADJUSTMENTS) : No <br /> (SELECT YES or NO TO ACCEPT ASPHALT COST ADJUSTMENTS) : No <br /> Company name: IHC Scott, Inc. <br /> Address: 7135 S. Tucson Way <br /> Centennial <br /> CO, 80112 <br /> County: Arapahoe <br /> By (signature) <br /> Exhibit A Page 20 of 59 <br />
The URL can be used to link to this page
Your browser does not support the video tag.