Laserfiche WebLink
8) Will groundwater be encountered and/or surface water intercepted or disturbed(check one): <br /> (El Yes or(JZI) No. <br /> a. If yes, please describe: <br /> 9) (Optional)Please provide additional information about the Mining Plan: <br /> The hnrrnw area will ha avrnvatad hV hPnrhinq -,IQr)As a [tenth of 5 - 10 fAAt Nn grnundwater will <br /> be exposed during the mining The mining excavation will then be graded to a 3.21 reclaimed <br /> slope and excess materials will be used to backfill prior to placing topsoil. The limits of mining are <br /> shown on the Exhibit E- Mining Plan map. <br /> Overburden and topsoil will be stockpiled as shown on the mining plan map. Topsoil from the <br /> topsoil stockpile will be used to reclaim the site. I he reclaimed slopes and disturbedarea where <br /> e topsoll stockpile is removed will be seeded as part of the reclamation of the site. <br /> The seed inix ai id PES per acre rates to be used to reclaim tl ie site are sl VwI i Oil Exhibit B- <br /> Reelamatien Plan, Seetien :7.d Zene 3 Pinyen�unipei:(Gagebicush Steppe, Western Plateau). <br /> The primary nommodit to he min d is fill dirt and hankfill material to hp iced for construction of SH <br /> 13 improvements <br />