Laserfiche WebLink
Reclamation Permit Application Package (111) <br /> Exhibit B—Site Description <br /> SH-71 Passing Lanes Revision Date: March 01, 2023 Page 1 of 2 <br /> CDOT Project Number: STA 0712-019 <br /> IHC Scott Project Number: 22406 <br /> Applicability <br /> In support of CDOT SH-71 (Project), IHC Scott has developed this Reclamation Plan for the borrow area associated <br /> with the Project. The Construction Material Rules and Regulations (the Colorado Land Reclamation Act for the <br /> Extraction of Construction Materials, Section 34-32.5-101 et sec., C.R.S., 34-32.5-116, and 2 CCR 407-1) and the <br /> Colorado Mined Land Reclamation Board regulate permitting, operational, and reclamation requirements for all <br /> construction material extraction operations in Colorado. As part of the permitting process, owners/operators <br /> must submit a 111 Reclamation Permit Application for construction projects that extract materials (e.g., sand, <br /> gravel,or quarry aggregate)for the sole purpose of obtaining material for highway, road, utility,or similar type of <br /> construction under a federal,state,county, city,town,or special district contract and where the contract calls for <br /> work to be commenced within a specifically short time affecting thirty(30)acres or less.This Reclamation Plan is <br /> Exhibit D of the Construction Material Special (111) Operation Reclamation Permit Application Package. <br /> Project Information <br /> The Project is located at three different sites between Limon and Brush. The Project includes erosion control, <br /> clearing and grubbing,topsoil removal/stockpile,pavement removal, roadway grading and sub-grade preparation, <br /> installation of irrigation and drainage structures, paving, signage and striping, and final erosion control and <br /> revegetation. In support of the grading portion of this project approximately 15,000 cubic yards of geotechnically <br /> suitable material will be borrowed from an offsite source(private property).The borrow area sits on a large parcel <br /> of land located on the southeast corner of the intersection of CR G and CR 3 (see Location Map in Exhibit A). The <br /> proposed start date for the project is April 10, 2023.The start date of borrow activities is to be determined based <br /> on project progression. <br /> Property and Borrow Area Owner Information <br /> W. Max(William Nelson) <br /> 3502 CR H <br /> Genoa, CO 80818 <br /> Operator Information <br /> IHC Scott <br /> 10303 East Dry Creek Road, Suite 300 <br /> Englewood, CO 80112 <br /> Operator's Contact Person <br /> Blake Foerster—IHC Scott Project Manager <br /> Email: bfoerster@ihcscott.com <br /> Cell: 720-376-3006 <br /> Responsible Party Information <br /> A" <br /> IHC SCOT <br />