My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-04-05_PERMIT FILE - M2023010
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2023010
>
2023-04-05_PERMIT FILE - M2023010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2023 8:50:11 PM
Creation date
4/5/2023 9:03:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2023010
IBM Index Class Name
Permit File
Doc Date
4/5/2023
Doc Name
Application
From
IHC, Scott, Inc.
To
DRMS
Email Name
SMS
JPL
JLE
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:3ABDCDAE-4B84-4B22-A37C-A4D48BC759BA <br /> PO#:461001885 <br /> Routing#:22-HA4-ZG-00115 <br /> insurance, as is necessary to meet its liabilities under the Act. Upon request by CDOT,the Contractor shall <br /> show proof of such insurance satisfactory to CDOT.Public entity Contractors are not required to name CDOT <br /> as an Additional Insured. <br /> H. When the Contractor requires a subcontractor to obtain insurance coverage,the types and minimum limits of <br /> this coverage may be different than those required, as stated above, for the Contractor, except for the <br /> Commercial General Liability Additional Insured endorsement and those that qualify as needing Professional <br /> Liability Insurance. <br /> 13. DEFAULT OF CONTRACT <br /> A. The Department may send a written notice of intent to find the Contractor in default to the Contractor and <br /> the Surety by certified mail for any of the reasons listed below.The notice will describe the conditions causing <br /> the impending default, advise them of the actions required for remedy, and state that if the conditions have <br /> not been corrected within ten days of receipt of the notice, CDOT will find the Contractor in default. The <br /> Department may send a written notice of intent under this part(a)if the Contractor: <br /> (1) Fails to begin the Contract work within the time specified to begin work,or <br /> (2) Fails to perform the Contract work with sufficient resources to assure its timely completion,or <br /> (3) Discontinues the Contract work,or <br /> (4) Fails to resume discontinued Contract work,or <br /> (5) Becomes insolvent, is declared bankrupt, commits an act of bankruptcy or insolvency,allows a final <br /> judgment to remain unsatisfied for a period of ten calendar days,makes an assignment for the benefit <br /> of creditors,or <br /> (6) Fails to comply with the Contract regarding minimum wage payments, DBE requirements, or EEO <br /> requirements,or <br /> (7) Is a party to fraud. If the Contractor fails to correct the conditions identified in the notice of intent to <br /> find the Contractor in default within ten calendar days of receipt, the Department may serve the <br /> Contractor with an immediate notice of default and take prosecution of the work from the Contractor. <br /> Copies of the default notice will also be sent,by certified mail,to the Contractor and the Surety. <br /> Notwithstanding any provision of this Contract or the Standard Specifications to the contrary, the State, in <br /> its discretion,need not provide notice or a cure period and may immediately terminate this Contract in whole <br /> or in part or institute any other remedy in this Contract in order to protect the public interest of the State;or <br /> if Contractor is debarred or suspended by the federal government or the State under§24-109-105,C.R.S.,the <br /> State,in its discretion,need not provide notice or cure period and may terminate this Contract in whole or in <br /> part or institute any other remedy in this Contract as of the date that the debarment or suspension takes effect. <br /> B. The Department may send a written notice of intent to find the Contractor in default to the Contractor and <br /> the Surety by certified mail for the reason listed below.The notice will include a stop work order which will <br /> require the Contractor to cease work on the Contract Items that are unacceptable. The notice will describe <br /> the conditions causing the impending default, advise the Contractor of the actions required for remedy and <br /> state that if the conditions have not been corrected within ten days of receipt of the notice, CDOT will find <br /> the Contractor in default. The Department may send a written notice of intent under this subsection B if the <br /> Contractor fails to perform the work to Contract requirements or neglects or refuses to correct or remove and <br /> replace rejected materials or unacceptable work. The Contractor shall not resume work on the unacceptable <br /> Contract Items until the following conditions have been met: <br /> (1) The Contractor shall submit a written proposal to the Engineer outlining the procedures which will be <br /> followed by the Contractor to correct the unacceptable conditions,and; <br /> (2) The Engineer and the Contractor shall meet to discuss the written proposal,and; <br /> (3) The Engineer will issue written permission for the Contractor to commence work. If the Contractor <br /> fails to meet these three conditions within ten calendar days of receipt of the notice of intent to find <br /> the Contractor in default,or if at any time after the Contractor resumes work,the work does not meet <br /> Contract requirements or the Contractor again neglects or refuses to correct or remove and replace <br /> rejected materials or unacceptable work,the Department may serve the Contractor with an immediate <br /> notice of default and take prosecution of the work from the Contractor. Copies of the default notice <br /> will also be sent,by certified mail,to the Contractor and the Surety. <br /> Document Builder Generated Page 10 of 51 Version 0419 <br />
The URL can be used to link to this page
Your browser does not support the video tag.