Laserfiche WebLink
Reclamation Permit Application Package (111) <br /> Exhibit D—Reclamation Plan <br /> SH-71 Passing Lanes Revision Date: March 01, 2022 Page 6 of 6 <br /> CDOT Project Number: STA 0712-019 <br /> IHC Scott Project Number: 22406 <br /> chemical treatment,fertilization, replacement of overburden, or like measures. When natural weathering <br /> and leaching of any of such affected land, over a period of five years after commencement of reclamation, <br /> fails to remove the chemical and physical characteristics inhibitory to plant growth or if, at any time within <br /> such five-year period, the board determines that any of such affected land is, and during the remainder of <br /> said five-year period will be, unplantable, the operator's obligations under the provisions of this article <br /> with respect to such affected land may, with the approval of the board, be discharged by reclamation of <br /> an equal number of acres of land previously mined and owned by the operator and not otherwise subject <br /> to reclamation under this article. <br /> (IV) With the approval of the board and the owner of the land to be reclaimed, an operator may substitute <br /> land previously mined and owned by the operator that is not otherwise subject to reclamation under this <br /> article or, in the alternative, with the approval of the board and the owner of the land, reclamation of an <br /> equal number of acres of any lands previously excavated or mined but not owned by the operator if the <br /> operator has not previously abandoned unreclaimed land affected by mining operations.As an alternative, <br /> the board may grant the reclamation of lesser or greater acreage if the cost of reclaiming such acreage is <br /> at least equivalent to the cost of reclaiming the original permit lands. If an area is so substituted, the <br /> operator shall submit a map of the substituted area conforming to all map requirements in this article. <br /> Upon completion of reclamation of the substituted land, the operator shall be relieved of all obligations <br /> under this article with respect to the land for which substitution has been permitted. <br /> (r) A building, or a structure placed on affected land during extraction operations, may remain on the <br /> affected land at the option of the operator with the approval of the landowner and the board if such <br /> building or structure conforms to local building and zoning codes and is compatible with the postmining <br /> land use. <br /> IHC SCOTT <br />